Project Title | Fall 2022 Roofing Improvements at McCleery Elementary School |
Physical Address | View project details and contacts |
City, State (County) | Aurora, IL 60506 (Kane County) |
Category(s) | Education, Single Trades |
Sub-Category(s) | Elementary School, Roofing |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Fall 2022 Roofing Improvements at McCleery Elementary School Lump Sum bid proposals will be received for this project at the scheduled time of receipt of bids and will be publicly opened and read aloud at the above stated time and place. Each bid must be accompanied by a Bid Guarantee in the form of a Bid Bond, Certified Check or Bank Draft in an amount equal to and not less than ten percent (10%) of the bid and made payable to "West Aurora School District #129." No bid shall be withdrawn for a period of sixty (60) days after the bid opening date without the consent of the Owner. Checks or drafts of unsuccessful Bidders will be returned as soon as practical, after opening and checking the bids. Successful Bidder must provide a Performance Bond and a Labor and Material Payment Bond in the full amount of the Contract, acceptable to the Owner. The Board of Education reserves the right to reject any or all bids or parts thereof or waive any irregularities or informalities in bidding. This Contract is subject to the Illinois Prevailing Wage Act (820 ILCS 130/1 et seq.). QUALIFICATION: Each Bidder must satisfactorily complete the qualification process described in Section 004395-General Requirements of the Project Manual, by providing the required Qualification Documents. The required Qualification Documents must be delivered along with the Bidder's sealed bid at the same place and time required for the bid. Contents of each Bidder's Qualification Documents will be available for public review. After the pre-bid meeting, everyone shall visit the site to view the area of work, gather additional information, and ask specific questions. There shall be only one scheduled walk-through of the site. Attendance shall be taken at the site to ensure that all contractors have visited the site. Non-attendance can be grounds for rejection of bid. The Project consists of fluid applied roof coating on existing single ply membrane roofing at McCleery Elementary School, 1002 W. Illinois Ave., Aurora, IL for West Aurora School District 129, hereafter called the Owner, and is to be constructed in accordance with the Contract Documents prepared by StudioGC, dated July 28, 2022. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |