Similar Projects
Lift Station #47 Rehabilitation - 18134 - City of Riviera Beach
Renovation
Conception
$4,198,420 CJ est. value
Riviera Beach, FL 33404

Media and Underdrain Replacement - 18139 - City of Riviera Beach
Renovation
Conception
$1,273,607 CJ est. value
Riviera Beach, FL 33404

Western Region North Wastewater Treatment Facility Electrical and Wet Weather Improvements
Infrastructure, Renovation
Bidding
$4,260,000 CJ est. value
West Palm Beach, FL 33401

Southern Region Water Reclamation Facility Process Improvements
Infrastructure
Post-Bid
$22,500,000 CJ est. value
West Palm Beach, FL 33401

Biosolids Hauling
Term Contract
Post-Bid
West Palm Beach, FL 33401

Aeration Basin No. 5 Improvements and New Head Works Bypass to Junction Box Project
Renovation
Results
$18,000,000 est. value
West Palm Beach, FL 33417

General Contracting Projects
Renovation
Results
FL

Nanofiltration Concentrate Blending with Reverse Osmosis Raw Water - W23XX - Town of Jupiter
Renovation
Conception
$1,818,084 CJ est. value
Jupiter, FL 33458

Water Treatment Plant #3 - Breakroom Renovate
Infrastructure
Post-Bid
$404,000 CJ est. value
Delray Beach, FL 33446

ECR Construction Phase- Mixed Liquor Transfer Channel Screens Project
Addition, Infrastructure, Alteration
Results
West Palm Beach, FL 33417

Deep Injection Well System - W23XX - Town of Jupiter
Renovation, Infrastructure
Conception
$22,551,933 CJ est. value
Jupiter, FL 33458

Green Cay - Phase 2
New Construction, Infrastructure
Post-Bid
$50,000,000 CJ est. value
Boynton Beach, FL 33437

Western Region Wastewater Treatment Facility Operations Building
New Construction, Term Contract - 4,582 SF
Results
$4,124,000 est. value
Belle Glade, FL 33430

14 MGD Membrane Softening Plant - City of Delray Beach
New Construction, Infrastructure
Conception
$108,706,250 CJ est. value
Delray Beach, FL 33444

RFQ Construction Manager - ECR-Blower Electrical Switchgear Upgrades, New Fiber Optic Cabling, New Electrical Building Project
Term Contract
Post-Bid
West Palm Beach, FL 33401

Last Updated 02/07/2023 11:24 AM
Project Title

East Central Regional (ECR) - Process Water Reclamation System for the Biosolids Facility

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33417   (Palm Beach County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $2,388,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 7, 2023, this project has not yet been awarded. A timeline for award has not yet been established. Process Water Reclamation System for the Biosolids Facility The East Central Regional Wastewater Treatment Facility (ECR), through its agent, the City of West Palm Beach (City), is accepting bids from qualified and responsible Contractors to furnish and assume full responsibility for all labor, material, construction equipment and machinery, transportation, tools, appliances, fuel, power, light, telephone, water, sanitary facilities, temporary facilities and all other facilities and incidentals necessary, including supervision, servicing, taxes, bonds and insurance, permitting fees, traffic control, security, miscellaneous costs, warranties, general conditions, overhead and profit to provide a packed water reclamation system for the ECR's Biosolids Process Water System (the "Work"). Site: ECR Wastewater Treatment Facilities 4375 Easley Drive West Palm Beach, FL 33417 Substantial Completion: 180 calendar days after NTP for Process Water Reclamation System for the Biosolids Facility Final Completion: 225 calendar days after NTP for Process Water Reclamation System for the Biosolids Facility. but not less than 45 days from Substantial Completion $1000 per calendar day for each day or part of a day after scheduled substantial completion of the work is not achieved $500 per calendar day for each day or part of a day after scheduled final completion and Final Completion of the work is not achieved.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents