Similar Projects
East State Boulevard Concrete Rehabilitation
Infrastructure
Bidding
$400,000 est. value
Fort Wayne, IN 46895

Alley R00453 E-W: East Lewis Street, Hugh Street, McCulloch Street Ohio Street
Infrastructure
Bidding
$200,000 est. value
Fort Wayne, IN 46895

Veterans Museum & Memorial Parking Lot Improvements
Post-Bid
Fort Wayne, IN 46818

2021 Right of Way On Call
Term Contract, Infrastructure
Post-Bid
Fort Wayne, IN

Northrop High School West Site Improvement
Results
Fort Wayne, IN 46800

Hessen Cassel Storm and Sidewalk Improvements
Results
Fort Wayne, IN 46800

Superior Street Urban Trail
Infrastructure
Bidding
$2,000,000 est. value
Fort Wayne, IN 46802

Annual Requirements for Large Meters
Term Contract
Post-Bid
Fort Wayne, IN

Roosevelt Park Boardwalk Improvements
Results
Fort Wayne, IN 46808

Valves
Term Contract
Post-Bid
Fort Wayne, IN

Lake Avenue Trail: Hobson Road to Coliseum Boulevard
Results
Fort Wayne, IN 46800

On Call Lead Replacement Construction Services
Term Contract
Post-Bid
Fort Wayne, IN

Yeager Lane Turn Lane
Results
Fort Wayne, IN 46809

Grabill Waterworks Improvements
Infrastructure
Post-Bid
$400,000 est. value
Grabill, IN 46741

Clinton Street Lane Reduction
Results
Fort Wayne, IN 46800

Reported 06/23/2022 12:00 AM
Project Title

Lincoln Highway Water Main and Trail

Physical Address View project details and contacts
City, State (County) New Haven, IN 46774   (Allen County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work shall consist of the installation of new concrete trail , approximately 1,250 lineal feet of eight-inch ductile iron water main, fire hydrants, valves , concrete curb and gutter, and ADA ramps. This work will also include water services, clearing and grubbing and all other work necessary to provide for a complete project.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents