Similar Projects
2021 MAC Technology Upgrades - IVISN and TRs
Build-Out, Infrastructure
Results
MN

2021 Baggage Claim Ticket Lobby Operational Improvements P1
Results
Less than $30,000,000 est. value
Saint Paul, MN 55111

Bathroom Renovations Bellanca Building
Renovation
Results
Alexandria, MN 56308

2022 Baggage Handling System
New Construction
Bidding
MN

2021 Safety and Security Center - Phase 1 (ARFF)
Renovation
Bidding
$28,000,000 est. value
Saint Paul, MN 55111

2021 Terminal 1 Miscellaneous Modifications
Renovation
Results
Minneapolis, MN

2021 G Concourse Rehabilitation P5
Renovation
Post-Bid
MN

2021 Baggage Claim Ticket Lobby Operational Improvements P2
Renovation, Demolition
Results
$7,250,000 est. value
Saint Paul, MN 55111

2021 Terminal 1 Passenger Boarding Bridge Replacement
Results
$3,347,600 est. value
MN

Settebello - MSP International Airport - Space LT-2205 Renovation
Renovation - 2,000 SF
Post-Bid
Minneapolis, MN

Brainerd Lakes Regional Airport Restaurant Space Remodel
Renovation - 3,200 SF
Results
Brainerd, MN 56401

Settebello - MSP International Airport - Space LT-2205 Renovation
Renovation - 2,000 SF
Post-Bid
Minneapolis, MN

2020 Terminal & Outbuildings Miscellaneous Modifications
Results
$588,000 est. value
Saint Paul, MN 55111

Prairie Lakes Transit Facility Renovation
Results
Fairmont, MN 56031

Last Updated 10/19/2021 11:44 AM
Project Title

2021 Terminal 2 and Outbuildings Miscellaneous

Physical Address View project details and contacts
City, State (County) Minneapolis, MN   (Hennepin County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $644,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

2021 Terminal 2 and Outbuildings Miscellaneous Modifications, as shown or specified including, but not limited to, the following major work items: 1. General Construction work for the project includes: Site improvements, selective demolition of existing construction; construction of new space with in existing areas, renovation of existing spaces, areas of exterior wall assemblies, interior build-out and renovation including finishes. 2. Mechanical Construction work for the project includes: Mechanical demolition; Fire protection systems; plumbing systems; HVAC ducted systems and hot and cold piping systems; radiant slab heating, and building automation systems . 3 . Electrical Construction work for the project includes: Electrical demolition; power distribution systems; uninterruptible power supplies; lighting ; communications systems, paging systems; access control systems , video surveillance systems, and fire alarm system.

Details

Airline/Passenger Terminal, New Construction.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents