Similar Projects
Last Updated | 04/06/2022 02:42 PM |
Project Title | Zebra Mussel Mitigation, Fort Randall |
Physical Address | View project details and contacts |
City, State (County) | Pickstown, SD 57367 (Charles Mix County) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Zebra Mussel Mitigation, Fort Randall: goal of this project is to award a contract for the construction of a liquid copper-based ZM mitigation system. The desired Copper Based Pesticide (CBP) distribution system will consist of four (4) base mounted metering pump assemblies w/ PLC controller, flexible tubing, and stainless-steel rigid tubing with compression type tube fittings such as Swagelok or similar. Each pumping system and 275 gallon liquid CBP tote on the secondary spill containment will be plumbed to injection ports (w/ injection quill) at the upstream piping of 14” raw water intake strainer at generator units 2, 4, 6, and 8. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |