Similar Projects
Julian Hall Asbestos Abatement
Results
Vermillion, SD

Steven High School Fine Arts/2nd Floor - Asbestos Abatement
Alteration
Bidding
Rapid City, SD 57702

Asbestos Abatement at Minnehaha County Administration Building
Alteration
Post-Bid
Sioux Falls, SD 57104

Last Updated 04/06/2022 02:42 PM
Project Title

Zebra Mussel Mitigation, Fort Randall

Physical Address View project details and contacts
City, State (County) Pickstown, SD 57367   (Charles Mix County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Zebra Mussel Mitigation, Fort Randall: goal of this project is to award a contract for the construction of a liquid copper-based ZM mitigation system. The desired Copper Based Pesticide (CBP) distribution system will consist of four (4) base mounted metering pump assemblies w/ PLC controller, flexible tubing, and stainless-steel rigid tubing with compression type tube fittings such as Swagelok or similar. Each pumping system and 275 gallon liquid CBP tote on the secondary spill containment will be plumbed to injection ports (w/ injection quill) at the upstream piping of 14” raw water intake strainer at generator units 2, 4, 6, and 8.

Details

Division 00 - Procurement and Contracting Requirements, Available Project Information, Environmental Assessment Information, Environmental Impact Mitigation Report.
Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Water Remediation.
Division 32 - Exterior Improvements, Wetlands.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents