Similar Projects
Marion Oaks Manor Resurface (SW 49th Avenue Road to CR 484)
Infrastructure
Bidding
$1,847,000 est. value
Ocala, FL 34474

Silver Springs Shores Resurfacing Project
Term Contract, Infrastructure
Bidding
$1,300,000 est. value
Silver Springs Shores, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Rainbow Lakes Estates Road Improvement Project 21/22
Infrastructure
Post-Bid
$1,000,000 est. value
Dunnellon, FL 34431

Design Build Push Button Contract No. 2 - Program Management
Results

NFSR 09-20.5 Road Construction
Results
$25,000 to $100,000 est. value
Silver Springs, FL 34488

CR 318 Reclaim and Widen Shoulders (from US Highway 441 to NW 24th Avenue)
Infrastructure
Bidding
$1,357,183 est. value
Ocala, FL 34475

NFSR 29-0.0 Road Construction Project
Results
$500,000 to $1,000,000 est. value
Silver Springs, FL 34488

Oak Road Resurfacing (2.2 Mile Loop off SE Maricamp Road)
Results
Less than $735,000 est. value
Ocala, FL 34471

Southeast 145th Street Mill and Resurface (from CR 475 to Southeast 47th Avenue) - 3.0 Miles
Results
Less than $1,003,200 est. value
FL

NFSR 74-4.6 Road Construction & NFSR 74-5.7 Box Culvert
Results
$500,000 to $1,000,000 est. value
Salt Springs, FL 32134

Kingsland County Estates/Ocala Waterway Road Improvement Project
Results
Less than $200,000 est. value
FL

Emergency Roadway Repair
Results
Less than $1,000,000 est. value

2020 Marion Oaks Resurfacing Project
Results
Less than $1,400,000 est. value
FL

Quiet Zone Improvement - South Ocala (SE 52nd ST, SE 62nd ST, SE 73rd ST, SE 80th ST at RR Crossings)
Results
Less than $502,304 est. value
FL

Last Updated 12/08/2021 08:35 AM
Project Title

Cedar and Ohio Roadway Project

Physical Address View project details and contacts
City, State (County) Dunnellon, FL   (Marion County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work involves restoring two roads and adding additional on street parking. Approximately 0.08 miles of Cedar Street will be restored with the addition of on-street parking and the repaving of an existing Art Gallery. Approximately 0.42 miles of Ohio street will be restored with the addition of on-street parking.

Details

Division 01 - General Requirements, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents