Similar Projects
Rehab of LS 54 and LS 65
Renovation
Bidding
Clearwater, FL 33759

Lift Station Maintenance and Repair
Bidding
Daytona Beach, DeBary, DeLand, Oak Hill, Orange City, Ormond Beach, Ponce Inlet, Port Orange, FL 32124

Bayshore Pumping Station Rehabilitation Design-Build
Post-Bid
Less than $3,500,000 est. value
Tampa, FL 33602

Wastewater Pump Station Construction and Rehabilitation Contractor Services Contract
Post-Bid
Maitland, FL

Professional Design Build Services for Construction Of The David L. Tippin Water Treatment Facility High Service Pump Station and Misc. Improvements
Results
Less than $50,000,000 est. value
Tampa, FL 33610

Rehabilitation of Lift Stations 14A, 15C, 17B, 19C, and 20CA
Results
Coral Springs, FL

Bradley Road Booster Pump Station
Construction
Less than $7,884,680 est. value
Jacksonville, FL 32246

City of Cape Coral Fire Station #2
New Construction - 10,559 SF
Construction
Fort Myers, FL 33990

Deep Injection Well Pump Station Utilities and Concrete Containment
Bidding
$1,500,000 est. value
Naples, FL 34117

Kaye Street Re-Pump Station Building Expansion
Addition
Post-Bid
West Palm Beach, FL

Pump Stations Controls Upgrade and Maintenance
Results
Less than $60,000 est. value
Weston, FL 33326

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

Submersible Pumps and Wastewater Lift Stations
New Construction
Bidding
Cocoa, FL 32922

SRF Wastewater Improvements Phase IIA
Post-Bid
De Funiak Springs, FL 32433

Panama City Beach - Lift Station 21 Improvements
Results
Panama City Beach, FL

Last Updated 02/03/2021 08:41 PM
Project Title

Sanitary Sewer Pump Station Casuarina 2 Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Coral Gables, FL 33143   (Miami-Dade County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $20,800
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of furnishing all labor, materials, equipment, tools, services, mobilization, and incidentals. The scope of work includes, but is not limited to the following: 1. Plug In-fluent pipe at Wet Well; 2. By-pass Installation; 3. Remove and dispose of existing discharge pipe, including fittings (e.g. reducers, elbows); 4. Remove existing pump’s bases. Pumps removed are to be provided to the City; 5. Repair and level Wet Well floor with Five Star DP Epoxy Grout; Install new 18" x 24" x 1/2" SS 316 Base Pump Plate, anchored to the floor with SS 316 Bolts, Nuts and Square washers; 6. Install new pumps bases (Provided by the City) with SS bolts, nuts, washers; 7. Install new 4-inch C-900 PVC-FM discharge pipes; 8. Install new fittings (e.g. new reducers, new DI elbows) and Megaflanges Restrained Flange Adapters with Stainless steel 316 Bolts; 9. Upon completion of the above task, City personnel shall perform new pumps installation and startup. Upon completion of this task by the City, the Bidder shall perform remaining tasks listed below. 10. Remove by-pass; 11. Clean Station.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents