Similar Projects
Banner Gilbert Medical Center Parking Lots
Design
Gilbert, AZ 85234

Regional FFP IDIQ MATOC Roads, Bridges, Construction and Maintenance Sources Sought
Term Contract
Bidding
$1,000,000 to $10,000,000 est. value
Flagstaff, Prescott, Rio Verde, AZ - Albuquerque, NM 86301

Pave Dirt Road
Infrastructure
Bidding
Less than $1,200,000 est. value
Peoria, AZ 85345

Phase VII Pavement Replacement
Post-Bid
Guadalupe, AZ 85283

Update Pavement Management Program
Post-Bid
Cave Creek, AZ

Phoenix-Casa Grande Highway (I-10) 1-17 (Split) to SR 202L (Santan)
Results
Chandler, AZ 85225

Sun City Festival Ranch Planning Area 2 Parcel C2 Paving
Results
Buckeye, AZ 85326

CarMax - Parking Lot
New Construction
Construction
Gilbert, AZ 85297

Riverpoint Parking Lot Addition
Addition
Construction
Phoenix, AZ 85040

Old Town Avondale Phase II Improvements - CMAR
Infrastructure
Bidding
Avondale, AZ

Construction Manager at Risk Broadway Road (Phase 1) - Mesa Drive to Stapley Drive
Post-Bid
$25,000,000 to $30,000,000 est. value
Mesa, AZ 85210

New Facilities (Construction of New Roads)
Results
Less than $2,192,000 est. value
Maricopa, AZ 85138

Sonoqui Wash Trail Improvements
Infrastructure
Bidding
Mesa, Queen Creek, AZ 85142

Construction Firms to Provide Job Order Contract (Joc) Services
Post-Bid
Surprise, AZ 85374

Van Buren Street to Moreland Street Engineering Services
Results
Phoenix, AZ

Last Updated 06/21/2021 02:41 AM
Project Title

System Preservation

Physical Address View project details and contacts
City, State (County) Avondale, Phoenix, Tolleson, AZ   (Maricopa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $14,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project is located in Maricopa County within the Cities of Avondale, Phoenix, and Tolleson on Interstate 10 from Avondale Boulevard to Interstate 17. The project begins at Milepost 131.45 and extends east to Milepost 143.60 for an approximate length of 12.15 miles on I-10 WB/EB. The Interstate 10 pavement rehabilitation work is located between MP 131.45 to MP 136.55 and MP 140.84 to MP 143.60. The SR 101L pavement rehabilitation work is located from Milepost 1.0 to Milepost 2.32. The work consists of milling 1 inch and placing AR-ACFC, signs, pavement marking, and other related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents