Similar Projects
Mount Vernon Transportation Center MEP
Alteration
Bidding
IN

Tankless Water Heater Replacement
Post-Bid
Bloomington, IN 47401

La Casa de Amistad Restroom
Renovation
Post-Bid
South Bend, IN 46619

Block Stadium Phase 5 - Bid Package #1 Plumbing, Heating Ventilating & Air Conditioning
Results
East Chicago, IN 46312

Central Dispatch Center - Trade Package 23
Renovation - 1,700 SF
Results
Less than $40,000 est. value
Morocco, IN 47963

Residential Energy Conservation Services
Renovation, Infrastructure
Post-Bid

2021 WMS Renovation - MEP Equipment Installation
Results
Brownsburg, IN 46112

Batchelor Middle School Mechanical, Plumbing and Control Upgrades
Alteration
Post-Bid
Bloomington, IN 47403

Bankers Life Fieldhouse - MEP Replacement/Repair- Phase 2
Results
Indianapolis, IN 46204

Coverdale Improvements - Mechanical and Wet Well
Results
Fort Wayne, IN

Plumbing Fixture Upgrades
Alteration
Results
New Haven, IN

Huntertown Elementary School Plumbing
Alteration
Results
$215,000 est. value
Huntertown, IN 46748

Plumbing Repair
Alteration
Results
Nashville, IN

Reported 02/23/2022 12:00 AM
Project Title

Plumbing Services at the James Hunter Building

Physical Address View project details and contacts
City, State (County) East Chicago, IN 46312   (Lake County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To provide Plumbing Services for replacement of drainage piping at one of our properties. for Plumbing Services. The East Chicago Housing Authority (ECHA) is needing services performed at the James Hunter Building located at 3625 Pulaski St., East Chicago, IN. 46312: Contractor shall install above and below ground sanitary waste piping and vent, Scheduled PVC DWV plastic piping and fittings will be used. Contractor shall furnish, at Contractor's own expense, all labor, materials and equipment necessary to carry out the terms of this contract. Contractor shall do all masonry work needed to complete the job (Sawing and cutting of concrete to access and install new drainage piping. Contractor shall perform excavation and backfill for underground plumbing work. Contractors shall make appropriate changes in cleanouts if needed. (or recommended) Contractor shall comply with all ECHA and United States Department of Housing and Urban Development (HUD) rules and regulations. The Contractor will make any connections of drains that are under concrete floor Contractor will install pipe hangers and supports for plumbing where needed.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents