Similar Projects
Regional Drinking Water Project Contract D - Water Distribution System
Renovation
Post-Bid
Cloquet, MN 55720

Great Bend Water Treatment Plant
New Construction, Renovation
Post-Bid
$5,500,000 est. value
Jeffers, MN 56101

Water Treatment Chemicals
Term Contract
Post-Bid
Bloomington, MN 55431

Water Reclamation Plant Phase I Remodel & Effluent Upgrade
Results
Rochester, MN 55901

Water Treatment Plant No. 2 Rehabilitation
Results
Forest Lake, MN

Bear Head Water Filtration System Replacement
Renovation
Bidding
MN

Oakdale Well 7 Temporary Treatment Facility
New Construction
Bidding
Oakdale, MN 55128

Water Treatment Facility Improvements
Results
Askov, MN 55704

Water Treatment Plant Improvements
Renovation
Results
Waldorf, MN

Regional Drinking Water Project Contract B - Water Treatment Plant
New Construction
Post-Bid
Cloquet, MN 55720

Water Treatment Services
New Construction
Post-Bid
New London, MN 56273

MWWTP Rehab and Facility Improvements
Results
Saint Paul, MN 55101

Water Reclamation Facility Flood Mitigation and Bank Stabilization
Renovation
Results
$3,000,000 est. value
Faribault, MN

Last Updated 11/20/2020 09:52 PM
Project Title

2020 Water Treatment Facility Improvements

Physical Address View project details and contacts
City, State (County) Waconia, MN 55387   (Carver County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Rehabilitation of four (4) existing filters: (a) Removing and replacement of existing filter media, underdrain, and washwater troughs. (b) Sandblast and paint upper 6 feet of interior concrete filter walls.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents