Similar Projects
Replacement Of Existing Dual Fuel Heating Boiler
New Construction
Bidding
Holyoke, MA 01040

Dust Collector
Bidding
Westfield, MA

Maintenance and Service of Rink Refrigeration Systems
Post-Bid
Less than $1,500,000 est. value

Boiler, Chiller and Related Equipment Replacement - General Bids
Post-Bid
Less than $4,000,000 est. value
Springfield, MA 01103

Repair HVAC, Marine Reserve Center
Results
$250,000 to $500,000 est. value
Chicopee, MA 34996

Air Compressor
Results
Westfield, MA 01085

Bowe School Ventilation Repairs
Pending Verification
$300,000 est. value
Chicopee, MA 01013

Source Capture Exhaust System
Post-Bid
Bondsville, MA

Cabot Manor Boilers
Results
$66,000 est. value
Chicopee, MA 01020

STCC AC Building 101 - HVAC Upgrades
Post-Bid
Springfield, MA

On Call HVAC Services
Results
Westfield, MA 01085

New Building Management System Used to Control the HVAC Equipment
Post-Bid
Less than $79,000 est. value
Springfield, MA 01101

Building Renovation and Rehabilitation at Barnum Street 705-1 and Lull Street 705-1D - Filed Sub-Bid
Results
Less than $201,986 est. value
East Longmeadow, MA

Install New HVAC System in Gym
Post-Bid
Less than $70,000 est. value
Westfield, MA

Boiler Replacement, The Pines 667-2
Results
Less than $71,883 est. value
Wilbraham, MA

Last Updated 04/30/2020 09:05 AM
Project Title

Boiler Replacement, Agawam Junior High School, MSBA Accelerated Repair Program - General Bids

Physical Address View project details and contacts
City, State (County) Feeding Hills, MA 01030   (Hampden County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $850,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate Replacement of two existing gas-fired boilers and related plumbing and electrical work at Agawam Junior High School, 1305 Springfield Street, Feeding Hills, MA 01030. This is an MSBA Accelerated Repair Project.

Details

Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents