Similar Projects
Add/Repair Base Infrastructure
Design
$1,000,000 to $5,000,000 est. value
Shaw Air Force Base, SC 29152

Silver Steps Hiking Trail Construction
Post-Bid
$40,000 to $50,000 est. value
Greenville, SC 29635

Blythewood Pedestrian Railing System
Term Contract
Post-Bid
Blythewood, SC 29016

Interstate 26 Widening MM 85-101
Results

Interstate 26 Widening MM 85-101
Results

Block-Cement and Asphalt Repair
Term Contract
Post-Bid
Charleston, SC 29402

Road Repairs for Plum Nelly, Paul Green, Wessinger and Yarborough Roads
Results
SC

Design/Build Construction for Dirt Road Paving Contract 51A
Post-Bid
Burton, Ladys Island, Saint Helena Island, Sheldon, SC

Group 6 Roadway Repair and Resurfacing Project
Results
SC

Martin Luther King Jr. Boulevard (S-17-96) Sidewalk Improvements
Post-Bid
Dillon, SC

Clemson Grove Road Improvements
Results
$400,000 to $600,000 est. value
Pendleton, SC

Repairs to Walking Tracks
Post-Bid
Marion, SC 29571

Fairfield CTC 2019 Road Paving Program
Results
SC

Asphalt Paving and Traffic Control for a Transportation Infrastructure Generating Economic Recovery (TIGER) Project
Post-Bid
SC

Paving of Industrial Road/High Street - CTC 2019
Results
Sumter, SC 29150

Last Updated 10/14/2020 07:53 AM
Project Title

Corridor Improvement - US 78 (Bamberg Co)

Physical Address View project details and contacts
City, State (County) SC   (Bamberg County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Construction Stakes, Lines & Grades 1.000 Ea Small Public Water Relocation No. ____ 001 1.000 Ea Traffic Control 1.000 Ls Cpm Progress Schedule 1.000 Ls Clearing & Grubbing Within Right Of Way 1.000 Ls Removal & Disposal Of Existing Pavement 1,310.000 Sy Removal Of Exist. Guardrail 254.000 Lf Unclassified Excavation 12,200.000 Cy Borrow Excavation 4,700.000 Cy Fine Grading 32,835.000 Sy Maintenance Stone 350.000 Ton Hot Mix Asphalt Base Course - Type b 15,010.000 Ton Hma Shoulder Widening Course 80.000 Ton Liquid Asphalt Binder Pg64-22 1,405.000 Ton Milling Existing Asphalt Pavement (Variable) 1,200.000 Sy Milled-In Rumble Strip 8.200 Mi Hot Mix Asphalt Intermediate Course Type b 3,465.000 Ton Hot Mix Asphalt Surface Course Type b 10,395.000 Ton Driveway Paving-Surface Type d 300.000 Ton Permanent Construction Signs (Ground Mounted) 540.000 Sf Pavement Markings(Temp-Paint) 4" Yellow Broken Lines 3,880.000 Lf Pavement Markings(Temporary-Paint)-4" White Solid Lines 43,410.000 Lf Pavement Markings(Temporary-Paint)-4" Yellow Solid Lines 18,780.000 Lf Pavement Markings(Temporary-Paint)-24"White Solid Lines 44.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 43,410.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 44.000 Lf 4" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 3,880.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 18,780.000 Lf Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 272.000 Ea Flat Sheet, Type Iii, Fixed Sz. & Msg. Sign 149.000 Sf u-Section Post For Sign Supports - 3p 308.000 Lf 15" Rc Pipe Cul.-Class Iii 136.000 Lf 18" Rc Pipe Cul.-Class Iii 658.000 Lf 24" Rc Pipe Cul.-Class Iii 34.000 Lf 30" Rc Pipe Cul.-Class Iii 12.000 Lf 36" Rc Pipe Cul.-Class Iii 48.000 Lf Rip-Rap (Class b) 20.000 Ton Geotextile For Erosion Control Under Riprap(Class 2)Type b 30.000 Sy Mt3 Leading End Treatment Tl3 18.000 Ea Mgs3 Gr Standard Shoulder 2,375.000 Lf Mgs3cs Gr Compressed Shoulder 500.000 Lf Temporary Barrier Fence 5,500.000 Lf Right Of Way Marker(Rebar And Cap) 6.000 Ea Right Of Way Plat 1.000 Ls Permanent Cover 18.364 Acre Temporary Cover 9.170 Acre Fertilizer (Nitrogen) 1,836.000 Lb Fertilizer (Phosphoric Acid) 1,836.000 Lb Fertilizer (Potash) 1,836.000 Lb Agricultural Granular Lime 36,720.000 Lb Selective Watering 135,750.000 Gal Mowing 55.000 Acre Turf Reinforcement Matting (Trm) Type 1 6.605 Msy Temporary Erosion Control Blanket (Ecb) 3.517 Msy Sediment Tubes For Ditch Checks 1,525.000 Lf Silt Fence 20,370.000 Lf Replace/Repair Silt Fence 2,037.000 Lf Removal Of Silt Retained By Silt Fence 5,095.000 Lf Stabilized Construction Entrance 550.000 Sy

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents