Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Wm Penn Hwy over Sunbury
Infrastructure, Renovation
Conception
$1,050,000 CJ est. value
Newport, PA 17074

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

Replace Aboveground Gas/Diesel Tanks At Bryner Maintenance HQ
Infrastructure
Bidding
$400,000 CJ est. value
Toboyne Township, PA 17006

Replace Aboveground Gas/Diesel Tanks At Bryner Maintenance HQ
Infrastructure
Bidding
$400,000 CJ est. value
Toboyne Township, PA 17006

Waggoners Gap Rd over Bak
Demolition, New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Landisburg, PA 17040

Construction of the Newport MH-IDD Office
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Newport, PA 17074

Structure Replacement, Kansas Valley Road Over Tributary to Kansas Valley Run
Infrastructure
Results
$136,000 CJ est. value
Blain, PA 17006

Haldeman Island Observation Deck
Infrastructure - 1,008 SF
Results
$226,052 CJ est. value
Duncannon, PA 17020

Marysville Lions Club Park Bridge Rehabilitation
Demolition, New Construction, Infrastructure
Construction
$53,320 CJ est. value
Marysville, PA 17053

Bretz Court Senior
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Newport, PA 17074

MRP Industrial Warehouses/ Amity Hall
New Construction, Infrastructure - 2,000,000 SF
Pending Verification
$200,000,000 CJ est. value
Shermans Dale, PA 17090

William Penn Highway over Fy Road
Infrastructure, Renovation
Conception
$600,000 CJ est. value
Newport, PA 17074

Alleghenyville Road (SR 3024) over I-176
Infrastructure
Design
$4,171,810 CJ est. value
Brecknock Township, PA 19540

Last Updated 10/10/2023 10:01 PM
Project Title

Prospect Avenue Tank Rehabilitation

Physical Address View project details and contacts
City, State (County) Duncannon, PA 17020   (Perry County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the rehabilitation of the 360,000-gallon water storage standpipe located at the extension of Chestnut Street beyond Prospect Avenue. The work to be performed consists of all the labor, material, equipment, layout, disposal, and all other incidental costs required to repair and recoat the potable water storage facility. Each bid must be accompanied by a certified check or bid bond payable to the Owner in an amount of not less than ten percent (10%) of the bid or bids. Only bonds from companies licensed to do business in the State where the Owner is located will be accepted and the bond shall so state same. Pennsylvania Prevailing Wage Rates will apply to this contract. Bids must be submitted unconditionally. No bidder may withdraw a bid within SIXTY (60) days after the scheduled closing time for receipt of bids. The Owner reserves the right to waive any informalities, or to reject any or all bids. Question Deadline 10/27/2023 at 6:00 PM ET. The Electronic Portal allows for bidders to post questions and Engineer responses. The questions and responses shall be considered part of the bid documents and will be incorporated into the bid documents through a statement in an addendum. After bid opening, no bidder may withdraw his bid within the time period indicated herein under "ADVERTISEMENT". Requests for withdrawal of bids after bid opening due to clerical error shall be made in accordance with Commonwealth of Pennsylvania Act. No. 4 (S.B. 793). The Owner shall have the right to reject any or all bids or any parts thereof, or items therein. The Owner's Solicitor shall have the right to waive technicalities for the best interests of the Owner. If an award of Contract is made, it will be made to the lowest responsible bidder, based on the Base Bid or any combination of the Base Bid and any of the selected Add Items within the time period indicated herein under "ADVERTISEMENT" or if not specified, within 60 days of the bid opening. Thirty (30) day extensions of time may be made by the mutual written consent of the Owner and the lowest responsible bidder. If the lowest bidder withdraws his bid or refuses or fails to proceed according to the Contract Documents, the Owner shall have the right to award the Contract to the next lowest responsible bidder or to reject all bids and re-bid the Project. The right is reserved by the Owner at its discretion to reject any or all bids or parts thereof. Bids may be rejected if they show any omission, alterations of form, addition or deductions not called for, conditional or uninvited alternate bids, or irregularities of any kind, or any other reason as the Owner shall determine. However, the Owner reserves the right to waive any defects or irregularities on bids. Having carefully examined the Contract Documents together with all Addenda, as prepared by the Engineers, and being familiar with the various conditions affecting the work, (including those under the General Conditions which provide for the payment of liquidated damages to the owner, hereafter set at $ 350.00 per calendar day, in the event the contract is not completed within the allotted time) the undersigned agrees to furnish all labor, materials and equipment to construct and complete within 90 consecutive calendar days, all the necessary contract work, in accordance with said contract documents, for which the following units and/or lump sum prices are submitted. Each Contractor shall furnish a surety bond in an amount to 100 percent of the contract for faithful PERFORMANCE; a separate surety bond in an amount equal to 100 percent of the contract for the payment of LABOR and MATERIALS; and a separate MAINTENANCE bond in an amount equal to 25% of the total contract price up to $200,000; plus 10% above $200,000. The PERFORMANCE AND LABOR AND MATERIALS bonds are to continue in effect for a period of one (1) year after final payment. The MAINTENANCE bond is to continue in effect for a period of two (2) years after the date of completion, approval, and acceptance of the entire work. Work shall not commence under this contract until each of the above bonds have been obtained.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents