Similar Projects
Storm Water Master Plan - Dixon Creek West Branch - Ponderosa To Glenridge - City Of Corvallis
Infrastructure
Conception
$465,000 CJ est. value
Corvallis, OR 97330

Traffic Signal Replacement - NW Circle Boulevard/N W Highland Drive - City of Corvallis
Infrastructure
Conception
$592,000 CJ est. value
Corvallis, OR 97330

US 20: Ellsworth Street (Willamette River) Bridge
Renovation, Infrastructure, Alteration
Design
$5,097,000 est. value
Corvallis, OR 97333

US 20: Ellsworth Street (Willamette River) Bridge
Renovation, Infrastructure, Alteration
Design
$5,097,000 est. value
Corvallis, OR 97333

Corvallis Fire Station 3 - Renovation and Addition Project
Addition, Demolition, Infrastructure, Renovation
Bidding
$2,600,000 CJ est. value
Corvallis, OR 97330

Corvallis Fire Station 3 - Renovation and Addition Project
Addition, Demolition, Infrastructure, Renovation
Bidding
$2,600,000 CJ est. value
Corvallis, OR 97330

North Albany Elementary School (NAES) and Waverly Elementary School (WES)
New Construction, Infrastructure
Post-Bid
$300,000 est. value
Albany, OR 97321

West Greenhouse Complex Construction Services
New Construction, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Corvallis, OR 97331

US 20 - Safety Upgrades (Albany to Corvallis) Albany - Corvallis Highway
Infrastructure
Results
Corvallis, OR 97333

Albany and Corvallis Signal Improvements - Benton and Linn Counties
Alteration
Results
$1,000,000 to $2,000,000 est. value

Rock Creek Water Treatment Plant Filter Project - City of Corvallis
Infrastructure
Conception
$1,600,000 CJ est. value
Corvallis, OR 97330

OR 34: Van Buren Bridge (Corvallis)
Demolition, New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Corvallis, OR 97330

RFP Design - New Benton County Courthouse
New Construction, Infrastructure
Post-Bid
$216,000 CJ est. value
Corvallis, OR 97330

Landmark Drive Road Reconstruction
Alteration
Results
$800,000 est. value
Philomath, OR

Water Pipe Replacement - Division Street - City of Corvallis
Infrastructure
Conception
$668,000 CJ est. value
Corvallis, OR 97330

Last Updated 08/04/2022 08:05 AM
Project Title

Street Resurfacing and Reconstruction - Walnut Boulevard / Conifer Boulevard

Physical Address View project details and contacts
City, State (County) Corvallis, OR 97330   (Benton County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $4,141,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will address aging and failing street pavement by: Resurfacing Walnut Boulevard between Jack London Street and Circle Boulevard including consideration for providing buffered bike lanes as described in TSP project B16; Resurfacing and reconstructing segments of Conifer Boulevard between Hwy 99 and the City Limits including an upgrade to railroad crossings at HWY 99W and Cheldelin Middle School as described in TSP project PB4. Consideration of bike improvements between Hwy 99 and ____ Circle will be given in support of TSP Project B50 and the low stress bicycle network. Opportunities for pedestrian crossing improvements on Walnut Boulevard at Jack London Street will be considered in order to improve connectivity between residential areas to the north and commercial areas to the south. ADA ramps that do not meet current standards will be replaced with the street work. Conifer Boulevard intersects neighborhood bikeways at Cambridge Circle and Lancaster Street. Corners reconstructed to meet ADA standards will include bulb-outs at these locations. This project is in included in the City of Corvallis FY 2023-2027 Capital Improvement Plan (CIP). As of august 04, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents