Similar Projects
Preventive Maintenance of Boiler Systems and Ancillary Equipment
Term Contract
Bidding
Utica, NY 13502

2021 - 2025 Heat and Hot Water Services
Bidding

Removal and Replacement of Boiler, Oil Burner, Circulator Motor and Associated Piping and Insulation
Post-Bid
South Salem, NY 10590

Mechanical, Plumbing and Electrical Work for the Lower Wappinger Creek Community Boat House
Post-Bid
Wappingers Falls, NY 12590

Z--528-18-S112 Install Mixing Valves in Building 1 of Buffalo VAMC. Remove the Old Rubber Angle Stops and Add Ceramic Angle Stops as Well as Associated Connections.
Results
$250,000 to $500,000 est. value
Bullville, NY 14215

Boiler Maintenance for Housing Contract
Results
Watervliet, NY

Furnish Steam to Water Domestic Hot Water Heaters
Bidding
Rochester, NY 14614

Gun Tube Heat Treat Furnace Replacement at the Watervliet Arsenal, NY
Post-Bid
$25,000,000 to $100,000,000 est. value
Watervliet, NY

Q--SPS RO Water System Service 528A7
Results
Syracuse, NY 13210

Robert Whalen Homes Boiler and DHW Replacement
Bidding
Albany, NY 12210

Granular Activated Carbon and Carbon Filter System Gravel Replacement - Project 4
Post-Bid
Niagara Falls, NY 14304

Annual Boiler/Burner Cleaning and Maintenance
Results
Pearl River, NY 10965

North Rockland High School Rooftop HVAC - Annex UV Replacement G. Neary Boiler Replacement
Bidding
Haverstraw, Thiells, NY 10927

Walter Panas High School Boiler Reconstruction
Post-Bid
Cortlandt Manor, NY 10567

Building 17 Power Plant Equipment Maintenance, Testing and Repair for Centrifugal Chillers at West Averill Harriman State Office Campus
Term Contract
Results
Albany, NY 12226

Last Updated 03/17/2021 08:40 AM
Project Title

West Gym & Events Center Gas Boilers - Mechanical

Physical Address View project details and contacts
City, State (County) Binghamton, NY 13902   (Broome County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The site work includes but is not limited to installation of protective fencing to enclose project site, demolition of existing utilities and hardscape features required to construct new building, earthwork required to prepare the site for new building, and installation of new utilities and hardscape features to support new building.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents