Similar Projects
North High School Master Facility Plan
Post-Bid
Downers Grove, IL 60515

ICR Wendell Phillips Academy HS
Post-Bid
Chicago, IL 60653

Oak Park & River Forest HS South Cafeteria Phase I
Renovation
Results
Oak Park, IL 60302

McHenry High School West Campus Addition and Renovations
Renovation, Addition - 64,000 SF
Results
Less than $44,000,000 est. value
McHenry, IL 60050

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

2021 Summer Renovations at West Oak Campus and Diamond Lake School
Renovation
Post-Bid
Mundelein, IL 60060

Disaster Recovery Services
Results

2021 Washroom and Life Safety Work
Renovation
Post-Bid
Palatine, IL 60067

CM at Risk - Partial High School Replacement and Junior High School/High School Renovation
Renovation
Results
Toulon, IL 61483

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

Disney II Magnet HS Convent Building Tuckpointing
Results
Chicago, IL 60602

Fitness Addition - East Building Addition Phase II
Addition - 89,000 SF
Post-Bid
Lincolnshire, IL 60069

Accessibility and Miscellaneous Work at Mille Proegler School
Results
Kankakee, IL 60901

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

East Building Addition Phase II - Fitness Addition
Addition
Results
Lincolnshire, IL 60069

Last Updated 01/19/2022 11:03 AM
Project Title

Weight Room, Wellness Center, and Dance Studio Refurbishing

Physical Address View project details and contacts
City, State (County) Channahon, IL   (Will County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Flooring: New flooring in the new weight room, wellness, center and dance studio, and hallway. The flooring shall be suitable for the purpose of the room. The specifications, including thickness and material, for the recommended flooring shall be included. Availability for options (color inlays, etc) shall be described with costs. The district is interested in receiving quotes for the hallway flooring for replacing the current tile with either tile or epoxy. Removing of door thresholds, if required, shall be included in bid. Mirrors: The new dance studio will receive new mirrors, size and location of mirrors shall be illustrated. Mirrors shall be able to accommodate installation of dance bars in walls Equipment: The district would like a proposal for outfitting its new weight room with new free weight equipment including weights, benches, bars, dumbbells, and racks. The new wellness center will keep its current cardio equipment, however the district would like to receive proposals for replacing its current machines with new resistance band equipmen

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents