Similar Projects
Van Nuys and Voss Mixed Use Development
New Construction, Infrastructure, Alteration - 86,550 SF
Design
Los Angeles, CA 91405

Master As-Needed Agreement M14 Curb Ramp Construction
Infrastructure
Bidding
$1,000,000 est. value
San Francisco, CA

Parking Lot Repairs and Seal and Stripe Services at the Concord Department of Motor Vehicles Field Office
Term Contract
Bidding
Concord, CA 94520

De Anza Park Pathway Renovation
Infrastructure
Post-Bid
$546,000 est. value
Sunnyvale, CA 94087

2021 Pavement Rehabilitation
Alteration
Post-Bid
$500,000 est. value
Ross, CA 94957

Removal and Replacement of Concrete within the Public Right-Of-Way
Infrastructure
Results
San Jose, CA

Marin County Jail Booking Area Barrier Removal for ADA Compliance
Infrastructure
Results
$159,249 est. value
San Rafael, CA 94903

Melrose Streetscape Project
Alteration
Bidding
West Hollywood, CA 90038

Parking Pay Station Site Improvements Lot J
Infrastructure
Post-Bid
$20,000 est. value
Rohnert Park, CA 94928

Fancher Creek Trail
Infrastructure
Results
$669,877 est. value
CA

Rapid Corridors San Pablo Avenue Project
Infrastructure
Bidding
Oakland, CA 94622

Colima Road Rehabilitation
Infrastructure
Post-Bid
$6,400,000 est. value
Whittier, CA 90603

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Power Inn Road Bicycle and Pedestrian Improvement
Infrastructure
Bidding
$2,740,000 est. value
Sacramento, CA 95811

Wayne Makin Park Slurry Seal Project
Renovation, Infrastructure
Post-Bid
$55,000 to $60,000 est. value
Norco, CA 92860

Last Updated 12/23/2021 04:48 PM
Project Title

Magnolia Avenue ADA Improvements

Physical Address View project details and contacts
City, State (County) Larkspur, CA   (Marin County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,805,550
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists generally of reconstruction of sidewalk, paving, and installing new trees, benches, trash receptacles, bicycle racks, and underground conduit to facilitate future lighting. Contractor is responsible for all work required to complete project including but not limited to traffic control, water pollution control, construction staking, removing AC & concrete, potholing, and possibly relocating utilities

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents