Similar Projects
Kitchen Renovation
Renovation
Conception
$491,600 est. value
Neillsville, WI

Chapel Remodel/ Camp Williams
New Construction
Conception
$559,800 est. value
Camp Douglas, WI

New Milwaukee Public Museum
New Construction, Infrastructure - 230,000 SF
Design
$240,000,000 CJ est. value
Milwaukee, WI 53202

South 13th Street Industrial Building
New Construction, Infrastructure - 191,406 SF
Design
$103,000,000 CJ est. value
Oak Creek, WI 53154

RFQ Contractor - EHRM Infrastructure Upgrades Design Madison VAMC
Renovation, Infrastructure
Bidding
$50,000,000 CJ est. value
Madison, WI 53705

Arcadia Readiness Center Construct Dumpster Enclosure
Infrastructure
Bidding
$500,000 CJ est. value
Arcadia, WI 54612

Century Drive Townhouses
New Construction - 73,680 SF
Post-Bid
Wautoma, WI 54982

Site Maintenance and Lawn Mowing
Post-Bid
Burlington, WI

Facilities Maintenance Building - MEP Bidders
Results
$1,205,000 est. value
Chippewa Falls, WI 54729

Facilities Maintenance Building - GC Bidders
Results
Less than $780,000 est. value
Chippewa Falls, WI 54729

W. 6th Street, Bridge Over Root River, P-51-0709
Infrastructure
Construction
$6,734,483 CJ est. value
Racine, WI 53404

Eighteen87 On Water Mixed-Use Development
New Construction, Infrastructure - 107,000 SF
Construction
$21,000,000 CJ est. value
Milwaukee, WI 53202

Prairie Heights Residences
New Construction, Infrastructure - 9,168 SF
Pending Verification
$40,000,000 CJ est. value
Eau Claire, WI 54703

Washington Avenue Multi-Family
Demolition, New Construction, Infrastructure
Pending Verification
$37,000,000 CJ est. value
Racine, WI 53403

Cape Crossing
New Construction, Infrastructure
Design
$85,000,000 CJ est. value
Franklin, WI 53132

Last Updated 11/04/2022 01:03 PM
Project Title

Remove/Replace Oil Water Separators

Physical Address View project details and contacts
City, State (County) Camp Douglas, WI 54618   (Juneau County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Military Facility, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

The objective of the project is to remove and/or replace the identified oil water separators on base. OWS at Bldg 326 shall be replaced and landscape restored. OWS at Bldg 627 shall be removed and the hole back filled and landscape restored. Drain pipe shall be routed from Heavy Equipment Wash Rack to the OWS at Bldg 324. This is a rebid from earlier this year.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents