Similar Projects
Libbie Mill Offsite Water Line Plans
New Construction
Post-Bid
Richmond, VA

Replace Potable Water Line
Results
Norfolk, VA

Water Main Installation and Service Contract - Step II
Results
Less than $13,550,280 est. value
Fairfax, VA 22031

Leesburg Pike and South Van Dorn Street Water Main Replacements
Results
Fairfax, VA 22031

Furnish and Deliver Fire Hydrants
Term Contract
Results
$238,651 est. value
Fairfax, VA 22031

Installation of New Water Facilities
Results
$5,000,000 to $8,000,000 est. value
Richmond, VA 23219

Annual Services Contract 7 for Taps and Laterals Installation
Term Contract
Results
Less than $600,000 est. value
Virginia Beach, VA 23456

South Van Dorn Street Water Main Replacement
Results
Fairfax, VA 22031

Troutville Meter System
Results
Troutville, VA

Rt. 11 Jolivue Waterline Upgrade
Results
Jolivue, VA

Installation of Area Velocity Non-Contacting Flow-Meter
Results
Accomac, VA 23301

College Creek Water Main Crossing
Results
Williamsburg, VA

Woodman Road Extension Water Main
Results
Henrico, VA 23228

Furnish and Deliver 4-Inch Through 48-Inch Zinc Coated Pipe
Term Contract
Results
VA

Chalkley Road Waterline Construction
Results
Chesterfield, VA 23832

Reported 08/18/2021 12:00 AM
Project Title

Cliff Mountain Water Project (Phase 1- Blackgum Lane)

Physical Address View project details and contacts
City, State (County) Gate City, VA   (Scott County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $640,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

a) The construction of Upper Cliff Mountain Water Project (Phase 1- Blackgum Lane), Contract 1, generally consisting of approximately 10,300 linear feet of 2-inch and 4-inch diameter main and appurtenances; and b) The construction of Upper Cliff Mountain Water Project (Phase 1- Blackgum Lane), Contract 2, generally consisting of approximately 2,200 linear feet of 3/4-inch diameter service line and appurtenances; and c) Construction materials associated with Upper Cliff Mountain Water Project (Phase 1 - Blackgum Lane), Force Account, generally consisting of two concrete vaults, two water pumps, one pump control panel, and miscellaneous plumbing components;

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents