Similar Projects
Saint Lawrence Water and Wastewater Improvements
Infrastructure
Results
$48,750 est. value
Saint Lawrence, SD

Geddes Consolidation Project Phase 3: 3.0 MG Ground Storage Reservoir
Post-Bid
$1,850,000 est. value
SD 57369

50,000 Gallon Water Tower Improvements
Infrastructure
Results
Castlewood, SD

Mount Rushmore National Memorial - Renovate Water Storage Tanks
Results
$1,000,000 to $5,000,000 est. value
Keystone, SD

10,000 Gallon Storage Tank
Term Contract
Post-Bid
SD

Water Meter, Water Tower and Lift Station Improvements
Renovation, Infrastructure
Results
$48,750 est. value
Saint Lawrence, SD

Water Tower No. 2A Improvements
Infrastructure
Results
$2,800,000 to $3,200,000 est. value
Dell Rapids, SD 57022

Water Tower Rehabilitation
Infrastructure
Bidding
Hartford, SD

Mount Rushmore National Memorial - Renovate Water Storage Tanks
Renovation
Results
$1,000,000 to $2,000,000 est. value
Keystone, SD

Water Distribution Improvements - Elevated Water Tower
Infrastructure
Results
$700,000 to $1,000,000 est. value
Lake Preston, SD

250,000 Gallon Water Tower No. 6A
Infrastructure
Results
SD

Volga 750,000 Gallon Water Tower 2020
Results
$2,600,000 to $2,800,000 est. value
Volga, SD

Milbank Ground Storage Reservoir Improvements
Infrastructure
Post-Bid
Milbank, SD

Last Updated 04/12/2022 02:11 PM
Project Title

Mitchell West Water Tower Improvements

Physical Address View project details and contacts
City, State (County) Mitchell, SD   (Davison County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bid Schedule A: • Clean, inspect and repair coatings on the interior wet portions of the water tower • Wash and overcoat exterior of the water tower • Surface preparation and coating of some parts of the interior dry areas • Cut and install larger access in upper dry tube • Install new feed pipe into wet riser • Furnish and install tank mixer • General electrical improvements Bid Schedule B: • Remove and replace various sized buried valves, pipe, fittings and connections • Remove underground valve vault and replace with a packaged steel vault • Reroute pipe into proposed wet riser pipe • Complete associated improvements such as wiring, site grading, seeding and related items

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents