Similar Projects
HVAC Maintenance-Services
Alteration
Bidding
KS

Airport - Installation of New HVAC Equipment and Construction of New Room Building Addition
Addition
Bidding
Wichita, KS 67209

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Roberts Building HVAC Replacement
Results
$439,994 est. value
Olathe, KS 66061

Chem-BioChem Building Fume Hood Upgrades- Phase 1
Results
$1,380,000 est. value
Manhattan, KS

Headworks Make-Up Air Unit Replacement HVAC Improvements
Post-Bid
McPherson, KS

FOSC - Move Heat Pump Unit
Term Contract
Results
$25,000 to $100,000 est. value
Fort Scott, KS 66701

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Replace HVAC Units at the Meadowlark and Sunflower Heights Complexes
Alteration
Results
Halstead, KS

Preventative Service Maintenance and Inspection of Commercial Chillers, Boilers and Pumps
Term Contract, Alteration
Post-Bid
Wichita, KS

Fire Station #2 HVAC System Improvements
Alteration
Results
Emporia, KS 66801

Heating, Ventilation, and Air Conditioning - HVAC On-Call Services
Alteration
Post-Bid
Wichita, KS

Lenexa Readiness Center Geothermal Ground Source Heat Pump HVAC Replacement
Alteration
Results
Less than $1,000,000 est. value
Lenexa, KS

HVAC Equipment
Alteration
Post-Bid
Wichita, KS

Last Updated 11/05/2021 05:02 PM
Project Title

Replacement of HVAC Equipment at the East Lawrence Recreations Center, Kaw River Waste Water Treatment Plant and Fire Medical Station 2

Physical Address View project details and contacts
City, State (County) Lawrence, KS   (Douglas County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of work includes all removal replacement and disposal of the HVAC equipment to include all electrical, building automation, ductwork, gas piping, condensate/refrigeration lines and control wiring shall be disconnected, removed and replaced as needed and reconnected in such a fashion as so the new equipment operates as intended and in accordance with the previous scheduling and set points.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents