Similar Projects
J--Annual Cleaning Service for Boiler Plant
Post-Bid
White River Jct, VT

Biomass System
Results
Townshend, VT 05353

Retainer Boiler and Furnace Services Statewide
Results
$30,000 to $150,000 est. value

Water Treatment Plant Boiler Replacement
Results
Burlington, VT

Ferrisburgh Central School Tunnel Infill
Results
Ferrisburgh, VT 05456

Last Updated 01/14/2020 12:45 PM
Project Title

N--Firepump Replacement Project

Physical Address View project details and contacts
City, State (County) White River Jct, VT VT   (Windsor County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

VA WRJ Campus Fire Pump Replacement - VA Project No. 405-16-015: Professional Services are required to provide all material, labor, supervision, commissioning, and ancillary requirements necessary to accomplish installation of a new fire pump system. Removal and disposal of the existing pump system: - Architectural: Architectural work includes, but is not limited to, Fire rated door, wall and ceiling construction, lighting relocation/installation, and finishes involved in renovations to accommodate the installation of a Fire rated room in which to house the new fire pump. - Structural: Structural work expected on this project primarily includes, but is not limited to partition construction, and support of mechanical equipment. - Fire Protection: The primary purpose of this project is to replace the existing fire protection pump system in its entirety. New pump, booster pump, controller, normal and emergency power supplies, and fire alarm integration are required. - Plumbing: Limited HVAC supply rework is included in this project. - Electrical: The existing feeders from each piece of demolished equipment will be removed back to the local power source including existing disconnect switches, conduit and wiring - HVAC: Limited HVAC work is included to rework/relocate existing unit heater(s) and supply piping. - Site Work: Site work is necessary as far as required to install new underground electrical feeders, install new fire protection piping to the new fire pump, and removal/demolition of existing fire pump and associated piping and electrical feeders. - Hazardous Materials: Existing fire protection equipment tests positive for lead based paint. Appropriate safe work practices for demolition of lead painted material are required.

Details

Division 01 - General Requirements.
Division 02 - Existing Conditions, Hazardous Material Assessment, Subsurface Investigation, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.
Division 21 - Fire Suppression, Fire Pumps.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents