Project Title | N--Firepump Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | White River Jct, VT VT (Windsor County) |
Category(s) | Single Trades |
Sub-Category(s) | Mechanical |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $500,000 to $1,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | VA WRJ Campus Fire Pump Replacement - VA Project No. 405-16-015: Professional Services are required to provide all material, labor, supervision, commissioning, and ancillary requirements necessary to accomplish installation of a new fire pump system. Removal and disposal of the existing pump system: - Architectural: Architectural work includes, but is not limited to, Fire rated door, wall and ceiling construction, lighting relocation/installation, and finishes involved in renovations to accommodate the installation of a Fire rated room in which to house the new fire pump. - Structural: Structural work expected on this project primarily includes, but is not limited to partition construction, and support of mechanical equipment. - Fire Protection: The primary purpose of this project is to replace the existing fire protection pump system in its entirety. New pump, booster pump, controller, normal and emergency power supplies, and fire alarm integration are required. - Plumbing: Limited HVAC supply rework is included in this project. - Electrical: The existing feeders from each piece of demolished equipment will be removed back to the local power source including existing disconnect switches, conduit and wiring - HVAC: Limited HVAC work is included to rework/relocate existing unit heater(s) and supply piping. - Site Work: Site work is necessary as far as required to install new underground electrical feeders, install new fire protection piping to the new fire pump, and removal/demolition of existing fire pump and associated piping and electrical feeders. - Hazardous Materials: Existing fire protection equipment tests positive for lead based paint. Appropriate safe work practices for demolition of lead painted material are required. |
||||||||||||||||
Details |
|
||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |