Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Draper Road Streetscape
Infrastructure
Conception
$5,040,500 CJ est. value
Blacksburg, VA 24060

Midtown - DC 5 Mixed-Use Building
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Blacksburg, VA 24060

Harding Avenue Stormwater and Pedestrian Project- Town of Blacksburg
Infrastructure, Renovation
Design
$3,489,012 CJ est. value
Blacksburg, VA 24060

RFP Construction Manager at Risk - Prequalification of Construction Managers at Risk (CM at Risk) for the New Business Building
New Construction, Infrastructure
Bidding
$670,000 CJ est. value
Blacksburg, VA 24060

RFP - Construction Engineering and Inspection (CEI) Services
Term Contract
Bidding
Christiansburg, VA 24073

Virginia Tech Hitt Hall Early Release Package
New Construction - 102,552 SF
Post-Bid
$65,500,000 est. value
Blacksburg, VA

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
$500,000 CJ est. value
Jacksonville, NC 28547

Auburn Park Mass Grading Plan for Future Public Park
New Construction
Results
Christiansburg, Riner, VA 24149

Subgrade Stabilization
Infrastructure
Results

Community Center Building HVAC Installation - Town of Blacksburg
Renovation, Infrastructure
Conception
$1,201,500 CJ est. value
Blacksburg, VA 24060

RFP - Water, Sewer, and Wastewater Treatment Term Services
Term Contract
Bidding
Christiansburg, VA 24073

Viewland Water System Improvements
Infrastructure
Post-Bid
VA

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

Meadowbrook Drive Trail - Town Of Blacksburg
Infrastructure
Conception
$1,750,000 CJ est. value
Blacksburg, VA 24060

Last Updated 08/12/2022 11:33 AM
Project Title

Roanoke Street Sewer Shed Upgrades - Town Of Blacksburg

Physical Address View project details and contacts
City, State (County) Blacksburg, VA 24060   (Montgomery County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $528,695 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the replacement of approximately 520 linear feet of sewer line identified as being over capacity. Much of this line is located alongside a tributary of Stroubles Creek, which will require more stringent erosion and sediment controls to protect the creek. These lines are located in the vicinity of Berryfield Lane and Penn Street. The funding for FY22 includes design of the project and the funding for FY23 includes all construction. The project is included in the town's 2023-2027 Capital Improvement Program (CIP). As of August 12, 2022, Draper Aden and Hurt & Profit teamed up to complete the design work. Bidding is expected to take place in the spring/summer of 2022. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents