Similar Projects
Pedestrian and Bicycle Improvements at Various Locations
Bidding
Less than $1,914,980 est. value

Connecticut River Walk and Bikeway Construction(including Prefabricated Pedestrian Bridge)Medina Street to Ferry Street
Bidding
Less than $2,723,000 est. value
Chicopee, MA 01013

CDBG Sidewalk Replacement
Post-Bid
$140,000 est. value
Holyoke, MA

Parking Lot Repairs
Post-Bid
Westfield, MA

Construction of the North end Pedestrian Underpass Beneath Connecticut River Railroad Between Plainfield Street and Birnie Avenue
Results
Less than $5,514,129 est. value
Springfield, MA

On-Call Curbing, Cobble Stone Paving, Specialized Paving, and Sidewalk Repair or Replacement
Results
$200,000 est. value
Westfield, MA

Paving and Excavation of Parking Lot Located at 180 Broadway Street
Post-Bid
$80,000 est. value
Chicopee, MA 01013

B28 Accessibility/Parking Upgrades: Rework Grades
Results
Less than $278,000 est. value
Springfield, MA

Construction of Various Pedestrian Improvements
Post-Bid
Less than $180,000 est. value
Holyoke, MA 01040

Site Improvements
Results
$500,000 est. value
Holyoke, MA

Ruth Elizabeth Park Connector Trail
Post-Bid
Less than $200,000 est. value
Springfield, MA 01103

Campus Road and Sidewalk Improvements Project - Phase 1
Results
Less than $425,000 est. value
Westfield, MA 01086

YTPM 19-0010 Construct Parking Lot, Building 7000
Post-Bid
$100,000 to $250,000 est. value
Chicopee, MA

FY20 Bids for Sidewalks
Term Contract
Results
Southwick, MA 01077

2019 Sidewalk Reconstruction and Related Items
Post-Bid
Less than $260,000 est. value
Chicopee, MA

Last Updated 06/06/2019 08:45 AM
Project Title

Springfield Street Sidewalk Upgrades

Physical Address View project details and contacts
City, State (County) Palmer, MA   (Hampden County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $180,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Various sidewalk upgrades along Springfield St. at Hryniewicz Park; High Street, from High School access drive, to Michael Drive; and Sykes St. from Main St. to Palmer District Court access drive.
Details
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents