Similar Projects
Signal System Upgrade - Paularino, Fair, Wilson, Anton - City of Costa Mesa
Infrastructure
Conception
$900,000 est. value
Costa Mesa, CA

209th Street ,Brant Avenue,Lamberton Avenue,Maciel Avenue,Selective Roadway - PW1116 - City of Carson
Alteration
Conception
$1,000,000 est. value
Carson, CA

Install Lighting, Widen Shoulders, Upgrade End Treatments at Bridge Approaches, and Rehabilitate Culverts
Infrastructure
Design
$18,100,000 CJ est. value
Chico, CA 95928

DeLong-Diablo Avenue Corridor Enhancements - 22-003 - City of Novato
Infrastructure
Design
$2,731,300 CJ est. value
Novato, CA 94945

Old Arcata Road Improvements, Project
Infrastructure
Bidding
$4,500,000 CJ est. value
Arcata, CA 95524

Tulare Complete Streets from 6th Street to Cedar Avenue
Infrastructure
Bidding
$1,874,073 CJ est. value
Fresno, CA 93721

Strip - Lighting, 72 LED, (1 EA. Per Tube)
Infrastructure
Post-Bid
Los Angeles, CA

On-Call Streetlight and Traffic Signal Maintenance Services
Term Contract
Post-Bid
$1,000,000 to $2,000,000 est. value
San Ramon, CA

Colorado Lagoon Open Channel Phase 2A
Infrastructure
Results
$21,123,100 CJ est. value
Long Beach, CA 90803

Sacramento Street Road Diet and Rehabilitation Project
Infrastructure
Results
$721,000 CJ est. value
Vallejo, CA 94590

Precast Conc Pvmt, Electronic Toll System, JPCP, CB & Structural Conc
Infrastructure
Construction
$175,969,550 CJ est. value
Sunol, CA 94586

Annual Concrete Replacement Program
Infrastructure
Construction
$2,740,000 CJ est. value
Carson, CA 90745

Bicycle Garden - 8007 - City of Antioch
Infrastructure
Pending Verification
$3,700,000 CJ est. value
Antioch, CA 94509

Lee Vining Rehabilitation from State Route 120 West to Picnic Grounds Road - Department of Transportation
Infrastructure
Pending Verification
$27,800,000 CJ est. value
Lee Vining, CA 93541

Traffic Signal Upgrades (M312.41 and M312.46) - PW1657 - City of Carson
Infrastructure
Conception
$4,100,000 est. value
Carson, CA

Last Updated 07/26/2023 04:03 AM
Project Title

RFP - Open Road Tolling System for the Bay Area Toll Bridges

Physical Address View project details and contacts
City, State (County) San Francisco, CA 94103   (San Francisco County)
Category(s) Outdoor Lighting
Sub-Category(s) Roadway Lighting
Contracting Method Competitive Bids
Project Status Construction start expected July 2023 , Request For Proposals, Construction documents
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 27th, 2022, the RFP did receive proposals on the 11th as advertised. All proposals and proposers are held confidential until the project has been awarded which is expected to be in April or May 2023. Request for clarification no later than March 31, 2021 by 4:00PM. The Bay Area Toll Authority (BATA) invites firms to submit a proposal for the Design, Installation, Commission, Operation and Maintenance of a new toll collection system at the seven (7) State-owned Toll Bridges in the San Francisco Bay Area. The project will convert toll collection operations from All Electronic Toll (AET) collection at toll plazas to Open Road Tolling (ORT). The scope of services consists of furnishing all labor, equipment, tools, transportation, machinery, supplies, materials, safety equipment, services, and incidentals to provide a complete Toll Collection System as well as Toll Operations Services and Maintenance Services under a single contract. The Scope of Work for this Project includes design, development, procurement, furnishing, fabrication, testing, installation, commissioning, operations, and maintenance of a complete and fully functioning system ("TOLL COLLECTION SYSTEM"). The Project includes providing a complete, functioning, electronic toll collection system that includes all necessary hardware, software, interfaces, electrical, and communications equipment, works in conjunction with the RCSC, and uses various technologies to facilitate toll collection. At this time, a budget for the project has not been established and will depend on the selected proposal. Questions Due Date: Mar 24th 2022, 4:00 PM PDT BATA expects the Work to commence on or about November 1, 2022 and to be completed no later than June 30, 2032

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents