Similar Projects
La Primera Tortilla Factory Expansion
Addition
Conception
$2,700,000 est. value
Sunland Park, NM 88063

Facebook Data Center
New Construction
Design
$800,000 est. value
Los Lunas, NM 87031

Orion Center - Phase I
New Construction - 4,100,000 SF
Design
$8,000,000,000 to $10,000,000,000 est. value
Albuquerque, NM 87123

Habitat Stamp Ecological Restoration Projects
Renovation
Post-Bid
Santa Fe, NM

Australia Exhibit at the ABQ Biopark Zoo
New Construction
Post-Bid
Albuquerque, NM 87102

Therapeutic Riding Arena Phase II
Results
Las Cruces, NM 88001

Cattle Handling Facility for Corona Range
Results
Las Cruces, NM 88003

Jabil Manufacturing
New Construction - 27,815 SF
Construction
$42,000,000 est. value
Albuquerque, NM 87106

Construction of ASCMV New Adoption Center Including the Rinconada and Burn Lake
Construction
Las Cruces, NM 88005

Nature`s Toolbox Large Expansion
Renovation - 25,000 SF
Pending Verification
Rio Rancho, NM 87144

Animal Shelter Rehab
New Construction
Pending Verification
$222,000 est. value
Albuquerque, NM

Rhino Health Glove Factory
New Construction - 100,000 SF
Design
$19,000,000 est. value
Albuquerque, NM 87102

Greenhouse Design/Build
New Construction
Post-Bid
Raton, NM

Glenwood Gila Trout Facility
New Construction
Results
Glenwood, NM

Apple Canyon Gourmet Facility
New Construction - 12,000 SF
Construction
Albuquerque, NM 87113

Last Updated 01/20/2022 03:31 PM
Project Title

Bright Green Cannabis Manufacturing and Processing Facility

Physical Address View project details and contacts
City, State (County) Grants, NM 87020   (Cibola County)
Category(s) Animal/Plant/Fish Facility, Industrial/Manufacturing
Sub-Category(s) Animal/Plant/Fish Facility, Manufacturing/Processing Plant
Contracting Method General Contractor to Subcontract.
Project Status Construction Commenced October 2021, Construction Completion Expected April 2022
Bids Due View project details and contacts
Estimated Value $300,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 1 of 880,000 SF glass facility with 80,000 SF support and manufacturing. Permits in progress for phases 2 and 3.

Details

Animal/Plant/Fish Facility, New Construction, 1 Manufacturing/Processing Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents