Similar Projects
Relining of Sanitary Lines at the Nursing Home
Infrastructure
Bidding
$300,000 CJ est. value
Laconia, NH 03246

Repaving Corrections Recreation Yard
Infrastructure
Bidding
$200,000 CJ est. value
Laconia, NH 03246

As-Needed Earthwork Repair Services
Term Contract
Post-Bid
Laconia, NH

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2021 Roadway Improvements
Results
Gilford, NH

Seal Coat, Crack Repair, and Restripe School Grounds
Results
Alton, NH 03809

Langley Cove
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Laconia, NH 03246

Langley Cove
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Laconia, NH 03246

Installation of Culvert on County Drive
Infrastructure
Bidding
$200,000 CJ est. value
Laconia, NH 03246

Asphalt Paving Services
Infrastructure
Post-Bid
Meredith, NH

Roadway Resurfacing
Results
$2,154,984 est. value

Street Sweeping
Term Contract
Post-Bid
Meredith, NH

Church Street and School Street Roadway and Water System Improvement
Results
Alton, NH

As-Needed or Emergency Earthwork Repair Services
Term Contract
Post-Bid
Laconia, NH

Crack Sealing on Town Roads
Results
Gilmanton, NH

Last Updated 09/06/2022 02:01 PM
Project Title

WOW Trail - City of Laconia

Physical Address View project details and contacts
City, State (County) Laconia, NH 03246   (Belknap County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $225,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans to extend the existing WOW Trail, allowing a connection that avoids growing vehicle traffic on the road. As of September 6, 2022, this project is in the planning phase. An engineer has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to August 2023.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents