Similar Projects
Wallops Flight Facility - Restoration of Main Base Electrical Infrastructure
Design
$5,000,000 to $10,000,000 est. value
Wallops Island, VA

ARFF Generator Replacement
Bidding
Richmond, VA

Replace Ceiling Lights Over the Leisure or Recreation Pool at the Aquatics Center
Bidding
Christiansburg, VA 24073

New Building Diesel Generator Fill-Up
Post-Bid
Roanoke, VA 24011

Generator Replacement Fire Station 3
Post-Bid
Richmond, VA 23237

Alexandria Train Yard ATC System Replacement
Results
$26,215,000 est. value
Alexandria, VA

Conmy Hall Lighting and Audio Upgrade
Results
Arlington, VA 22211

Generator Maintenance and Repair Services
Term Contract
Bidding
Richmond, VA 23220

On-Demand Electrical Maintenance and Repairs
Term Contract
Post-Bid
Christiansburg, VA 24073

Field Lighting at Rockingham Park at the Crossroads
Results
Penn Laird, VA

Generator Install
Bidding
Richmond, VA 23222

Preventive Maintenance and Corrective Action for UPS Systems
Term Contract
Post-Bid
Virginia Beach, VA 23456

Repair Service for RRHA-Owned High Voltage Primary and Secondary Electrical Systems
Results
Roanoke, VA 24017

Whelen Emergency Lighting, Equipment and Replacement Components
Term Contract
Bidding
Chesterfield, VA

Battery Purchase and Professional Service For L-17 Battery Replacement and Installation
Post-Bid
Alexandria, VA

Last Updated 03/30/2020 12:19 PM
Project Title

Henley and Burley Panel Upgrades and Jouett Switchgear

Physical Address View project details and contacts
City, State (County) Crozet, VA 22932   (Albemarle County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $500,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of select existing panelboards at Burley Middle School, including major distribution panel, and Henley Middle Schools and replacement of the switchgear and electrical panels in the main mechanical room and other select panels throughout the school at Jouett Middle School.

Details

Division 26 - Electrical, Switchboards and Panelboards.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents