Similar Projects
Unit Ventilator Replacements at North Plainfield Middle School and High School
Renovation - 66,268 SF
Sub-Bidding
$800,000 CJ est. value
North Plainfield, NJ 07060

Kean University Miron Student Center (MSC) HVAC Renovation Project
Renovation
Sub-Bidding
$1,700,000 CJ est. value
Union, NJ 07083

HVAC and Mechanical Products
Term Contract
Post-Bid

Hydrogen Peroxide Air Filtration & Disinfection Products
Post-Bid

Mechanical Upgrades - Partial Roof Top Unit Replacement
Results
Washington, NJ 07882

Maintenance Services for HVAC for Union County Educational Services Commission
Term Contract
Results
Westfield, NJ 07090

Installation of 11 low voltage UV sanitizing modules in existing HVAC equipment
Alteration
Post-Bid

Pool HVAC Unit Replacement at Developmental Learning Center
Results
New Providence, NJ 07974

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Preventative Maintenance and Emergency Repair Service for the Heating, Air Conditioning, and Automatic Temperature Control Systems at Various Public Buildings
Term Contract
Results
Elizabeth, NJ

Furnish and Deliver Digester Exhaust Fan Replacements EF-5, EF-7, and EF-11
Alteration
Post-Bid
Elizabeth, NJ

Install New Furnaces and Radiant Heating System
Results
Westfield, NJ 07090

Preventative Maintenance & Repair of Commercial Kitchen Exhaust Systems
Term Contract
Post-Bid

HVAC Service and Maintenance for Various Municipal Buildings
Alteration
Results
Union, NJ

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

Last Updated 10/11/2022 04:04 PM
Project Title

Kean University Hennings Cooling Tower Replacement Project

Physical Address View project details and contacts
City, State (County) Union, NJ 07083   (Union County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $798,400 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of replacement of the existing cooling tower (CT-1) located on Hennings Hall roof and cooling tower pumps (P-1 & P-2) located in mechanical penthouse. Additional work associated with the equipment replacement includes BMS integration, electrical, structural, and roofing upgrades to support the new installation. The subject line of your email must read "BID SUBMISSION Bid No. K22-6-22-2". Hard copy bids will not be accepted regardless of whether the bid documents permit the submission of hard copy bids. Bidders will be fully responsible for the delivery of their bids. Late bid submissions will NOT be accepted. Each bid shall be accompanied by a security payable to Kean University. The bid security shall be in the amount of 10% of the bid amount, and shall be given by bid bond. If a contract is awarded, the successful bidder shall enter into contract and shall furnish a Performance Bond and a Payment Bond, each equal to 100% of the bid amount submitted. Deadline for inquiries and substitutions is July 27, 2022 at 12:00 p.m. All inquiries must be submitted in writing to Faruque Chowdhury at henningscoolingbid@kean.edu and cc to avarava@exchange.kean.edu. In order to inspect the job site prior to submitting a proposal, bidders must contact Antonetta Pontoriero at apontori@exchange.kean.edu to schedule an appointment.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents