Similar Projects
Generator Load Bank Maintenance
Term Contract
Design
Hines, IL 60141

Standby Generator Testing, Maintenance and Repair Services
Term Contract
Post-Bid
Chicago, IL 60605

Painting Services at the Harold Washington Social Security Center
Post-Bid
Chicago, IL 60661

Water Meter Transmission Unit Replacement
Results
Streamwood, IL 60107

Maple Street Pumping Station Electrical Modifications
Renovation
Results
Des Plaines, IL 60018

GAP #0503 - Refresh
Renovation
Construction
Chicago, IL 60657

Oak Park Central Pumping Station Drywall Repair and Painting
Post-Bid
Oak Park, IL 60302

AC Nielsen Tennis Center LED Lighting
Results
Winnetka, IL 60093

J059--UPS Maintenance
Post-Bid
Chicago, IL

Pullman State Historic Site Development
Renovation
Results
Less than $1,500,000 est. value
Chicago, IL 60628

J059--UPS Maintenance
Post-Bid
Chicago, IL

Switch Gear Reconditioning & Preventative Maintenance
Results
IL 60141

Street Light Pole Painting
Post-Bid
Morton Grove, IL 60053

Lighting Fixture Upgrades
Results
Hazel Crest, Markham, IL 60428

Lighting Replacement at Rolling Meadows Library
Post-Bid
Rolling Meadows, IL 60008

Last Updated 12/13/2021 11:06 AM
Project Title

Four Flaggs Tank Rehab, Painting and Tower Facilities Lightning Protection and Oriole Tower Lightning Protection

Physical Address View project details and contacts
City, State (County) Niles, IL 60714   (Cook County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Electric, Painting, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Painting and rehabilitation of the standpipe including full blast of the interior wet portion of the standpipe and the interior dry areas of the dry pilasters, painting these areas, scarifying and overcoating the exterior wet portion of the standpipe, removal of the existing 4'-0" of the pilasters that have rusted and replacing those sections of the pilasters with new painted steel, installation of new cathodic protection system, water destratification system, grounding system, SCADA modifications, valving and piping modifications, and furnishing all the materials, labor, equipment and incidentals required for the work, and all other incidental work necessary to complete this improvements in the Village of Niles. Oriole Water Tank: The Work consists of grounding system.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 09 - Finishes, Painting.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents