Similar Projects
J056--Automatic Door Maintenance Service
Design
Salisbury, NC

Replacement Windows (Vinyl)
Bidding
Robersonville, NC 27871

Entry Doors (Steel)
Bidding
Robersonville, NC 27871

Overhead Rolling Steel Fire Door
Post-Bid
Wilmington, NC 28401

Glass Repair, Installation and Maintenance Services
Term Contract
Post-Bid
Charlotte, NC

Beaufort County Detention Center Locking System Upgrade
Results
Less than $772,065 est. value
Washington, NC 27889

Civic Center Clerestory Window Replacement
Results
Washington, NC 27889

NCAG&CS Butner Food Distribution Warehouse
Construction
Creedmoor, NC

BTWHS Window Replacement Design
Bidding
Less than $225,000 est. value
Rocky Mount, NC 27801

Albemarle Traffic Services Building Windows
Post-Bid
Albemarle, NC 28001

Corridor Flashing and Hollow Metal Window Repairs Gateway Education Center
Results
Greensboro, NC 27405

Glass Replacement and Repair for Buildings
Term Contract
Bidding
Raleigh, NC

AE Building Storefront Glass Window
Post-Bid
Asheboro, NC

Z--Purchase and Replace Bi-Fold Doors
Results
Durham, NC 27705

N--Replace Garage Door Openers
Post-Bid
Durham, NC 27705

Last Updated 06/25/2020 10:36 AM
Project Title

Capital Fund Project NC 75-50118

Physical Address View project details and contacts
City, State (County) Albemarle, NC   (Stanly County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. At Sites A&B: Provide new hardware for existing aluminum storm doors; clean. Provide new front and rear entry door; insulated steel door, redi-fit steel frame, wood framing and trim and provide new hardware. 2. At Site A: Remove all interior wood doors, hardware and hinges. Sand, prep, prim and paint. Re-install doors with new hinges and privacy/passage sets. 3. At Site B: Remove all interior storage room doors, closet doors, interior bedroom doors, bathroom doors, hardware and hinges. Sand, prep, prim and paint. Re-install doors with new hinges and privacy/passage sets. 4. Unit Prices will be taken to provide new doors when existing doors are not re-usable as determined by Owner. HUB Participation Goal for 10%

Details

Division 05 - Metals, Structural Metal Framing.
Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents