Similar Projects
The Cove at Thorpe Creek
New Construction, Infrastructure
Conception
$17,000,000 CJ est. value
Fishers, IN 46040

Intersect. Improv. W/ Added Turn Lanes
Infrastructure
Design
$7,830,687 est. value
Greenfield, IN 46140

Redwood Apartment Neighborhoods / Greenfield
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Greenfield, IN 46140

Indianapolis Regional Airport - Taxilane Reconstruction
Infrastructure
Bidding
$300,000 CJ est. value
Greenfield, IN 46140

Indianapolis Regional Airport - Taxilane Reconstruction
Infrastructure
Bidding
$300,000 CJ est. value
Greenfield, IN 46140

New Fortville Elementary School - Early Release - BP 1,2,3 and 4
New Construction, Infrastructure
Sub-Bidding
$4,000,000 CJ est. value
Fortville, IN 46040

Franklin Street Trail Extension
Infrastructure
Post-Bid
Less than $28,412 est. value
Greenfield, IN 46140

Liquid Asphalt
Infrastructure
Post-Bid
Greenfield, IN

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

Road and Bridge Reconstruction with Added Travel Lanes
New Construction, Infrastructure
Results
IN

Woodfield Pointe
New Construction, Infrastructure
Construction
$80,000,000 CJ est. value
Greenfield, IN 46140

Morningside at McCordsville
New Construction, Infrastructure - 1,400 SF
Pending Verification
$360,000 CJ est. value
McCordsville, IN 46055

Morningside at McCordsville
New Construction, Infrastructure - 1,400 SF
Pending Verification
$360,000 CJ est. value
McCordsville, IN 46055

Intersect. Improv. W/ Added Turn Lanes
Infrastructure
Design
$7,830,687 CJ est. value
Greenfield, IN 46140

Crack Sealing
Infrastructure
Post-Bid
Greenfield, IN

Last Updated 01/13/2023 09:12 AM
Project Title

Hancock County CR300N 600W to 700W Bridge Replacement

Physical Address View project details and contacts
City, State (County) New Palestine, IN 46163   (Hancock County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected June 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $6,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not been identified. As of July 8, 2022, the project is in design. The design completion timeline has not been released. A tentative bid schedule for contractors is scheduled for December 2023; however, the firm date has not been identified. Construction is slated to begin in 2024.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents