Similar Projects
Menards / Green Township
Demolition, New Construction, Infrastructure - 173,000 SF
Conception
$14,000,000 CJ est. value
Cincinnati, OH 45248

Combined Sewer Overflow 402-406 Wet Weather Improvements - City Of Cincinnati
Renovation
Conception
$14,018,000 est. value
Cincinnati, OH 45202

The RED - Commercial Building
New Construction, Infrastructure - 50,000 SF
Design
$15,000,000 CJ est. value
Cincinnati, OH 45227

Lindsay Lofts and Blair Lofts Phase II
New Construction, Infrastructure
Design
$24,000,000 CJ est. value
Cincinnati, OH 45229

FY 2022 - Signing
Infrastructure
Bidding
$1,786,235 CJ est. value
Cincinnati, OH 45231

SR 134 - Culvert Replacement
Infrastructure
Bidding
$641,000 CJ est. value
Lynchburg, OH 45142

Redevelopment of 31 Garfield Place
Infrastructure
Post-Bid
Cincinnati, OH 45202

Kenwood Triangle Disposition and Development
Infrastructure
Post-Bid
Blue Ash, OH 45242

Embshoff Woods Wastewater Improvements
Results
$219,213 est. value
Cincinnati, OH 45238

Little Red Schoolhouse STS Replacement
Renovation
Results
Cincinnati, OH 45243

Montgomery Quarter
New Construction - 192,000 SF
Construction
$150,000,000 est. value
Montgomery, OH 45242

Montgomery Quarter - Public Site Improvements - Sequence 3
Construction
$5,200,000 est. value
Cincinnati, OH 45242

RFP Engineering - Water Main Replacement 2023 Project Bundle 4
Infrastructure
Pending Verification
$400,000 CJ est. value
Cincinnati, OH 45202

Artisan Village
New Construction, Infrastructure - 440,000 SF
Pending Verification
$1,300,000,000 CJ est. value
Cincinnati, OH 45246

West Fork Channel Rehabilitation - City of Cincinnati
Infrastructure
Conception
$1,000,000 CJ est. value
Cincinnati, OH 45202

Last Updated 03/15/2023 06:01 PM
Project Title

Mill Creek Treatment Plant Fuel Oil Storage Tank Repairs

Physical Address View project details and contacts
City, State (County) Cincinnati, OH 45204   (Hamilton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected April 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of 3/15/2023 No Responses Received No hard copies of bids will be accepted. Bidders must submit bids electronically through the City's Vendor Self Service website. Bidders must be registered to submit a bid. Bidders can register and submit bids at electronically. A Bid Bond, deposit of cash or Certified Check, Bank Cashier's or Bank Official's Check drawn on a solvent bank payable to the Treasurer of the City of Cincinnati, in the amount of not less than ten percent (10%) of the total amount of the bid must accompany each bid as a guarantee that if the bid is accepted a contract will be entered into. Bidder must use the Construction Bid Surety and Signature Form included in Section 2, as none other will be accepted. The successful bidder will be required to provide performance surety in the amount of 100% of the contract value. A performance bond surety shall be kept fully in effect for one year following the acceptance of the final statement of costs by the City. 8 REQUIREMENTS AND DATA (See Excel Pricing Form attachment/Volume 3) BIDDER NOTE: Leaving entries Blank or "0" is an option and will be interpreted as No Charge (a bid of $0.00). Wage rates and labor categories indicated in the ITB and subsequent contracts will be enforced by Contract Compliance. SEE SPECIFICATIONS BELOW If the amount of the performance surety ceases to be adequate or satisfactory security for the City, the contractor shall, within five (5) days after notice of the City, furnish a new or additional bond, in form, and signed by such sureties as shall be satisfactory to the City. No further payment shall be deemed due nor shall any further payment be made to the contractor unless and until such new or additional bond shall be furnished and approved. The premium on such bond shall be paid by the contractor. If surety is in the form of a cashier's check or certified check, such surety will be refunded to contractor one year following the acceptance of the final statement of cost by the city. No Bid Received

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents