Similar Projects
Stripping and Waxing Vinyl Composition Tile Floors at Enterprise campus
Renovation
Sub-Bidding
$100,000 CJ est. value
Enterprise, AL 36330

Space Camp, Habitat #1 Flooring Replacement Phase II
Renovation
Sub-Bidding
$200,000 CJ est. value
Huntsville, AL 35801

Flooring Annual Contract
Term Contract
Post-Bid
Mobile, AL

Terrazzo Refurbishment
Alteration
Post-Bid
Mobile, AL 36602

Michael Square Revenue Department LVT Flooring
Results
Mobile, AL 36609

TCS Annual Summer Floor Strip and Waxing
Term Contract
Results
$200,000 est. value
Trussville, AL

New Flooring For The Eutaw Primary School For The Greene County Schools
Renovation
Sub-Bidding
$200,000 CJ est. value
Eutaw, AL 35462

Flooring Upgrades at Ashland Elementary School
Alteration
Post-Bid
Ashland, AL 36251

Flooring Improvement
Alteration
Results
$200,000 est. value
Killen, AL

Concrete Floor Resurfacing
Alteration
Post-Bid
AL

Corridor Flooring Renovations for Winston County Schools
Alteration
Results
$200,000 est. value
Double Springs, AL

Flooring for Various Madison County Departments
Alteration
Post-Bid
AL

High Performance Vinyl Flooring to be Installed in Portable Building
Renovation
Results
$21,687 CJ est. value
Mobile, AL 36602

Replacement Wood Gym Flooring Southside High School
Alteration
Post-Bid
Southside, AL 35907

Purchase and Installation of New Flooring in the Baldwin County Judge of Probate Building
Alteration
Post-Bid
Bay Minette, AL 36507

Last Updated 06/20/2023 09:33 AM
Project Title

Cherokee Elementary School Gymnasium Floor

Physical Address View project details and contacts
City, State (County) Guntersville, AL 35976   (Marshall County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $168,250 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

WORK COVERED BY CONTRACT DOCUMENTS A. The Work of Project is defined by the Contract Documents and consists of the following: 1. Removal of existing rubber flooring and tile in gymnasium. Installation of new modular athletic flooring panels.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents