Similar Projects
Odor Control Services for WWTP
Post-Bid
Less than $50,000 est. value
Corpus Christi, TX 969917

Operating, Maintaining, Monitoring of Jacintoport Wastewater Plant
Post-Bid
Houston, TX

Pine Gully Wastewater Treatment Plant - Phase 1A
Results
$3,000,000 to $3,200,000 est. value
Seabrook, TX 77586

Wastewater Screening Equipment Installation and Influent Structure Modifications
Results
$350,000 est. value
New Boston, TX 75570

Caughfield Phase Ten Paving, Drainage, Water Wastewater Improvements
Post-Bid
Austin, TX 78728

Wastewater Treatment Plant Facilities Rehabilitation
Results
Less than $3,500,000 est. value
Houston, TX 77000

Blackhorse Ranch WWTP Recoating
Post-Bid
TX

Capital Improvement Program Multiple Projects
Addition
Results
Sugar Land, TX

Construction of Harrington Trails Phase I WWTP Site Work and Wet Well
Post-Bid
TX

Contract 1 - Intake and Water Treatment Plant
Results
Less than $7,032,561 est. value
Mart, TX 76664

Fine Screen to serve Northpointe Regional WWTP
Post-Bid
TX

Waste Water Treatment Plant Expansion to 0.99 MGD
Results
Katy, TX 77493

Water And Wastewater Plant Operation Services
Post-Bid
Conroe, TX

Wastewater Treatment Plant Expansion to 0.99 MGD
Results
Katy, TX 77493

Stonewall Ranch Section 9
Post-Bid
Austin, TX 78735

Last Updated 06/30/2021 05:10 PM
Project Title

John T. Hickerson WRP Ultraviolet Disinfection Replacement

Physical Address View project details and contacts
City, State (County) El Paso, TX 79922   (El Paso County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,812,448 to $2,238,906
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes demolition of the existing ultraviolet (UV) disinfection system and furnishing and installing a new UV system at the John T. Hickerson Water Reclamation Facility. The existing system has equipment in five (5) channels which will all be removed as part of this project. The new system will consist of three (3) channels of new UV disinfection equipment with a treatment capacity of 35 MGD, new flow conditioners and new level control gates, all to be furnished and installed under this project. New electrical cabling, conduit and appurtenances are also part of the project to provide a complete and in-place UV disinfection system. Integration of the new equipment with the existing Plant SCADA system will be required for this project.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents