Similar Projects
City Hall Relocation - City of Jasper
Renovation, Infrastructure
Design
$5,000,000 CJ est. value
Jasper, AL 35501

Constructing the Roadway and Intersection Improvements
Infrastructure
Bidding
$1,280,614 CJ est. value
Fayette, AL 35555

Constructing the Roadway and Intersection Improvements
Infrastructure
Bidding
$1,280,614 CJ est. value
Fayette, AL 35555

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Jasper Downtown Paving 2022 (Planing/Milling, Resurfacing, and Striping)
Infrastructure
Results
$300,000 est. value
Jasper, AL

Roadway and Intersection Improvements (Grading, Drainage, Pavement, Widening, Pedestrian Sidewalk, Traffic Signs, and Traffic Stripe) on SR-171 at SR-18
Infrastructure
Results
$1,444,929 CJ est. value
Fayette, AL 35555

Freddys Frozen Custard & Steakburgers / Jasper
Demolition, New Construction, Infrastructure
Pending Verification
$900,000 CJ est. value
Jasper, AL 35501

Freddys Frozen Custard & Steakburgers / Jasper
Demolition, New Construction, Infrastructure
Pending Verification
$900,000 CJ est. value
Jasper, AL 35501

Constructing the Resurfacing (Micro-Surfacing Seal Coat) - I-22
Infrastructure
Bidding
$7,123,558 CJ est. value
Jasper, AL 35501

2022 Fayette City Street Resurfacing Project
Infrastructure
Post-Bid
Fayette, AL

Bridge Replacement and Approaches on Smith Chapel Road
Demolition, New Construction, Infrastructure
Results
$1,757,760 CJ est. value
Carbon Hill, AL 35549

New Parking Lot and Access Road for Oakman High School
Infrastructure
Post-Bid
$400,000 est. value
Oakman, AL 35579

Safety Widening, Micro-Milling, Resurfacing, Bridge Guardrail Retrofit, and Traffic Stripe on SR-18 (US-43)
Infrastructure
Results
$4,898,610 CJ est. value
Fayette, AL 35555

Taxilane Pavement Maintenance
Infrastructure
Post-Bid
$200,000 CJ est. value
Fayette, AL 35555

Last Updated 04/04/2023 12:04 AM
Project Title

Safety Widening, Micro-Milling, Resurfacing (Scrub Seal), and Traffic Stripe on SR-102

Physical Address View project details and contacts
City, State (County) Carbon Hill, AL 35549   (Walker County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $3,360,295 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County : Fayette Constructing the Safety Widening, Micro-Milling, Resurfacing (Scrub Seal), and Traffic Stripe on SR-102 from the junction of SR-171 northeast of Fayette to the junction of Otts Road. Length 4.731 mi. The Bracket Estimate on this project is from $2,793,031 to $3,413,704 . Contract Time: 55 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 028 - Safety Widening, Micro-Milling, Resurfacing (Scrub Seal), and Traffic Stripe on SR-102 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents