Project Title | Tamerlane Drive Lift Station O Pump Replacement |
Physical Address | View project details and contacts |
City, State (County) | Mequon, WI 53097 (Ozaukee County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Request for Qualifications, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $117,614 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | ENGINEERING PROJECT FILE NO. 3491-23-O: Project includes replacing 2 pumps, 2 check valves, and 4 isolation valves at Lift Station O located at the intersection of Tamerlane Drive and Huntington Drive. COMPLETION DATES: All work shall be substantially completed by Friday, February 2, 2024. All work shall be complete by Friday, March 8, 2024. Failure to meet this deadline will result in the assessment of liquidated damages as specified by the contract documents.. QUALIFICATION STATEMENT: In accordance with Wis. tat. 66.0901(2), Bidders shall be required to submit a statement of financial ability, equipment, and experience in the work prescribed. This Qualification Statement shall be submitted to the office of the Engineer no less than five days prior to the opening of bids. Failure to submit a qualification statement at least five days prior to bid opening will result in the rejection of the bid. Qualification Statement forms can be obtained at the office of the City Engineer. An evaluation of qualification statements will be made by the Engineer who will provide a recommendation to the Common Council prior to award. Those firms whose qualifications are found to be unacceptable shall be disqualified from consideration of award. BID SECURITY: A certified check, or satisfactory Bid Bond payable to the City of Mequon in the amount of not less than five (5%) percent of the Bid shall accompany each Bid as guarantee that if the Bid is accepted the Bidder will execute and file the Contract Performance Bond and Insurance Certificate as required by this contract within ten (10) calendar days after Notice of Award of the Contract by the City. BID REJECTION: The City reserves the right to reject any and all Bids, waive any informalities or irregularities in Bidding or accept any Bid or Bids which, in the opinion of the City, shall serve the Citys best interest. BID WITHDRAWAL: No Bid may be withdrawn for a period of ninety (90) days after the time and date set for the opening thereof, without the consent of the City. AWARD OF CONTRACT: It is anticipated that authorization to award to the selected qualified, responsive and responsible low bidder will be granted at the April 11, 2023, Common Council meeting. The selected contractor shall, within ten (10) calendar days after notification, provide to the City of Mequon the required contract documents for signature. All work shall be done in compliance with the Contract Documents. The ENGINEER shall decide all questions regarding the quality and acceptability of materials furnished, work performed, workmanship, rate of progress of work, and interpretation of the Plans and Specifications. The ENGINEER shall decide all questions of acceptable fulfillment of the Contract, compensation, and disputes and mutual rights between CONTRACTOR'S under the specifications. The CITY or CITY'S ENGINEER shall determine the amount of work performed and materials furnished |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |