Similar Projects
Cash Corner Fire Station
New Construction - 17,000 SF
Construction
South Portland, ME

2019 Bar Harbor Police Department Interior Renovations
Renovation
Results
Bar Harbor, ME 04609

Readfield Public Library Roof Replacement and Fire Station Expansion
Addition
Results
Readfield, ME

Lewiston Fire Sub-station
Results
Less than $4,300,000 est. value
Lewiston, ME 04240

N. Temple Fire Station Clerk Of The Works
Results
Lewiston, ME

Design-Build Contractors for the New Fire Sub-station
New Construction - 5,000 SF
Results
Less than $1,000,000 est. value
Wells, ME

Grading & Covering of Lagoons
Post-Bid
Waterville, ME

Public Safety Building Addition and Renovations
Renovation, Addition
Results
Windham, ME

Construction of Brunswick Fire Station
New Construction - 25,361 SF
Post-Bid
Brunswick, ME

Last Updated 12/10/2020 10:37 AM
Project Title

Rockwood Fire Station Expansion

Physical Address View project details and contacts
City, State (County) Rockwood, ME 04976   (Somerset County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Remove trees to the left side of the station in the building area 2. Prepare the ground for the slab 3. Put in a 6” (inch) slab pinned to the existing with a raised haunch to match the existing building 4. Run radiant heat lines in the slab and tie into the existing system 5. Pour floor with 400PSI mix and re-bar 6. Frame walls with 2 x 6 construction 7. Remove shingles on the South (left) side of roof and redo with addition to match north (right) side 8. Sheath for ice and water and shingle 9. Install metal siding to match existing siding 10.Install new overhead door to match existing doors 11.Cut a new entrance doorway in the new addition. Take out a window and cut cement to the floor. Remove rear door for a second access point 12.Install new rear entrance door in back of the new addition 13.Install all new electrical lines to include outlets, LED ceiling lights and tie into the existing electrical panel 14.Insulate the structure to meet code 15.Apply interior sheathing on walls and ceiling that is moisture resistant and waterproof panels from the haunch up 6 feet 16.Cut out rear of what will be the middle bay once the addition has been added and put in a new garage door that matches the from door that will be 12 ft. wide x 12 ft. high 17.Remove all debris, clean the site when the project is done

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents