Similar Projects
Cameron Peak Fire Mitigation Construction Work
Alteration
Post-Bid
Greeley, CO

Westerly Filing 1 Open Space Restoration Project
Alteration
Post-Bid
CO

F--Mass Planting
Results

Power Substation Bare Ground Weed Control CO/WY/NE
Term Contract
Results

Right of Way Landscape Design, US Highway 85 at 31st Street
Alteration
Post-Bid
Evans, CO 80620

Lily Lake Deep Fuels Reduction Project - Romo
Term Contract
Results

Reunion Ridge Phase 2-4 Landscape Improvements
Alteration
Post-Bid

Evans Community Complex Demonstration Garden Renovation
Alteration
Post-Bid
Evans, CO 80620

Farm Revegetation and Operation and Maintenance Services
Term Contract
Post-Bid
Ault, CO 80610

USFS Region 1/Region 4 Hand Thinning
Term Contract
Post-Bid

USFS Region One Timber Stand Improvement and Hand Fuels Treatments
Alteration
Post-Bid

Parks and Right of Way Mowing Services
Alteration
Post-Bid
Milliken, CO 80543

35th Avenue Landscape and Irrigation
Alteration
Post-Bid
Greeley, CO 80634

Abatements - Snow Removal, Trash Removal and Lawn Care
Infrastructure
Post-Bid
Greeley, CO

Habitat and Invasive Species Services
Term Contract
Post-Bid
Less than $98,500,000 est. value

Last Updated 10/19/2022 01:36 PM
Project Title

37th Street Row Landscaping

Physical Address View project details and contacts
City, State (County) Evans, CO 80620   (Weld County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Landscaping, Landscaping/Irrigation
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of 5/23/22 Addendum 1-3 is available. Contact owner for more information! The 37th Street ROW Landscaping consists of landscape improvements along Right-of-Way within Evans, Colorado. The scope of the project includes portions of Mountain View Road, portions of Harbor Lane & 37th Street. For exact location of work, refer to the maps in Article 5, some portions of the project identified in the plan set have been excluded from this project for various reasons. A brief summary of the site work includes clearing existing scrub vegetation and mulch from right-of-way landscape areas, and installing site improvements such as gabion walls, rock mulch, planting areas and irrigation. General Requirements - Insurance Required - Contractors License Required - Installation Required - License Required Bonding Requirements - Bid Bond - 5 $ - Performance Bond - 100 % - Payment Bond - 100 % Questions are submitted online - No Question Acceptance Deadline - 05/13/2022 07:00 PM EDT

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents