Similar Projects
Mechanical Equipment Replacement - 2022
Alteration
Bidding
$200,000 est. value
Norcross, GA 30071

Brookwood High School - HVAC Modifications
Post-Bid
Snellville, GA 30078

HVAC Modifications for South Gwinnett High School
Post-Bid
Snellville, GA 30078

Human Services Center Roof and HVAC Replacement
Results
Norcross, GA 30093

Phillips State Prison Chiller Replacement
Results
Buford, GA 30519

HVAC and Mechanical Products
Term Contract
Post-Bid

Pneumatic Control System Services
Term Contract, Alteration
Results
$56,070 est. value

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC Filters for Stock
Infrastructure
Results

HAVC System Maintenance Services at Various County Facilities on an Annual Contract
Term Contract, Alteration
Post-Bid
Lawrenceville, GA

Milli-Q-Iq 7005 Purification System
Alteration
Results
Macon, GA

Comprehensive HVAC Services - Annual Contract
Term Contract
Post-Bid
Lawrenceville, GA 30045

RTU 1 and 2 Replacement-Building 700
Alteration
Results
Lawrenceville, GA 30043

Building Maintenance Air Purifiers
Alteration
Post-Bid
GA

West Gwinnett Aquatic Center Duct Replacement
Alteration
Results
Berkeley Lake, GA 30096

Last Updated 04/26/2022 04:35 AM
Project Title

Radio Tower HVAC Replacement Projects

Physical Address View project details and contacts
City, State (County) Lawrenceville, GA 30043   (Gwinnett County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: Remove and replace eleven (11) existing wall mounted, packaged air conditioning units with new systems of the same type. Remove and replace eleven (11) existing ground mounted, packaged air conditioning units with new systems of the same type. New units shall be mounted on steel framework at approximately 18” above grade (existing units are mounted on grade). Remove and replace all existing ductwork and air distribution devices for all twenty-two (22) systems that are replaced. Provide new control components to integrate new HVAC systems into existing Automated Logic building control and monitoring systems at each of the eleven (11) radio tower installations.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents