Similar Projects
Crab Orchard NWR-IDIQ Road & Associated Infrastructure Maintenance
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Marion, IL 62959

Illinois 37 Improvements - Illinois Department of Transportation
Infrastructure
Design
$1,200,000 CJ est. value
Marion, IL 62959

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Bituminous Material & Aggregate
Infrastructure
Post-Bid
Stonefort, IL

Repair Asphalt Roads at USP Marion
Results
$500,000 to $1,000,000 est. value
Marion, IL 62959

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

Saline River Farms Meat Processing Plant
New Construction, Infrastructure - 83,000 SF
Pending Verification
$40,000,000 CJ est. value
Creal Springs, IL 62922

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Driveway Pavement Removal and Replacement
Infrastructure
Results
Herrin, IL

Overlay The Existing OC Streets, Various Surface Removal, and Provide Traffic Control
Infrastructure
Post-Bid
$400,000 est. value
Pittsburg, IL

RR-21-4821 Pavement Repairs
Infrastructure
Results

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Reconstruct Existing Lane Confirguration With Traffic Signal Modifications and Pavment Markings on Williamson County Parkway at 17th Street
Infrastructure
Results
Marion, IL

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Washington Middle School Parking Lot Repairs
Infrastructure
Results
$200,000 est. value
Johnston City, IL 62951

Last Updated 01/17/2023 11:36 AM
Project Title

Construction of a Mid-block Crosswalk With ADA Ramps, Median Refuge Island, Rectangular Rapid Flashing Beacons, Highway Lighting and Appropriate Pavement Markings on IL 13

Physical Address View project details and contacts
City, State (County) Marion, IL 62959   (Williamson County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $246,246 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the construction of a mid-block crosswalk with ADA ramps, median refuge island, rectangular rapid flashing beacons, highway lighting and appropriate pavement markings on IL 13 at Ray Fosse Park in Marion IL. Region 5 District 9 Federal Project # HSIPUJHH(164) County(s) Williamson Key Route(s) FAP 331 Marked Route(s) IL 13 Section(s) 6Z(SFY-1) State Job #(s) C-99-071-22 PPS #(s) 9-00710-2340 Contract No. 78957 WILLIAMSON County Section 6Z(SFY-1) Route FAP 331 Project HSIP-UJHH(164) District 9 Construction Funds Completion Date : 35 Working Days Questions not accepted as of November 08, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, October 28, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 059 - Construction of a Mid-block Crosswalk With Ada Ramps, Median Refuge Island, Rectangular Rapid Flashing Beacons, Highway Lighting and Appropriate Pavement Markings on IL 13

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents