Similar Projects
Last Updated | 09/09/2022 10:32 AM |
Project Title | District and Community Services (DACS) Winter and Spring Asbestos Removal |
Physical Address | View project details and contacts |
City, State (County) | Byron, MN 55920 (Olmsted County) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Questions shall be referred to: Ian Dickhausen, Project Manager INSTITUTE FOR ENVIRONMENTAL ASSESSMENT Institute for Environmental Assessment, 210 Woodlake Drive SE, Rochester, MN 55904. Phone: 763-377-3894 This project includes the removal of non-asbestos containing 1' x 1' ceiling tiles and associated asbestos-containing ceiling tile adhesive, asbestos-containing mudded fittings on fiberglass insulation, non-asbestos containing 1' x 1' ceiling tiles and associated less than one percent (<1%) asbestos-containing ceiling tile adhesive, asbestos-containing window caulking, tackboard with asbestos-containing adhesive, and chalkboards with asbestos-containing adhesive. Bidders must use the bid form supplied in the Project Manual. No oral, telegraphic or telephonic proposals or modifications will be considered. Submit with each bid a certified check, or acceptable bidder's bond, payable to Byron Public Schools in an amount equal to five percent (5%) of the total bid. The successful bidder will be required to furnish satisfactory Labor and Material Payment Bond and Performance Bond. Bids may not be withdrawn within thirty (30) days after the scheduled time of the bid opening without the written consent of the school. The School Board of Byron Public Schools, reserves the right to accept any bid or to reject any or all bids, or parts of such bids, and waive informalities or irregularities in bidding. The Owner requires Substantial Completion of the project on or before July 31, 2023. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |