Similar Projects
Z--Replace Water Control Structures 64 and 65
Design
Brigham City, UT 84302

Autocamp Zion
New Construction - 8,441 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Virgin, UT 84779

US-40 Wasatch Co Line to SR-32 Pvmt and Structures
Infrastructure
Bidding
$467,731 est. value

US-40 Wasatch Co Line to SR-32 Pvmt and Structures
Infrastructure
Bidding
$467,731 est. value

Country Road Land Drain Project
Post-Bid
Fruit Heights, UT 84037

Fold and Form Pipe Liner
Term Contract
Post-Bid
Taylorsville, UT 84129

Summit County Slurry Seal Project
Results
$300,000 to $350,000 est. value
Coalville, UT 84017

2020 Roadway Improvement Project
Results
Less than $600,000 est. value
Tooele, UT 84074

Low Book Sales Dealership Expansion
New Construction, Alteration
Pending Verification
Lindon, UT 84042

SLCo Sam's Blvd Overlay
Infrastructure
Bidding
$920,000 to $1,380,000 est. value
Kearns, UT 84118

2020 Trails Pavement Maintenance Project
Post-Bid
Draper, UT 84020

I-215; Various Locations Preservation - Roadway
Results
$500,000 to $1,500,000 est. value
UT

SR-24 Asphalt Rehabilitation and Shoulders Project
Infrastructure
Bidding
UT

Construction of the Street Crack and Slurry Seal Project
Post-Bid
$250,000 est. value
Centerville, UT 84014

Asphalt Patching - Crack Seal, Seal Coat and Striping
Results
Mount Pleasant, UT 84647

Reported 09/28/2021 12:00 AM
Project Title

UDOT Pavement and Approach Slab Stabilization and Lifting AVL

Physical Address View project details and contacts
City, State (County) State-Wide: UT
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To Provide Pavement and Approach Slab Stabilization and Lifting Work through Void Filling and Deep Soil Injection Utilizing an Expanding, Two-Component, Closed Cell, High Density, Polyurethane Foam with a Mixing Ratio of 1:1 by Volume on an as Needed Basis to the State of Utah, Department of Transportation (UDOT), for a Period of Three (3) Years.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents