Similar Projects
2020 Municipal Water Filtration Improvement
Renovation
Post-Bid
Somers, IA

Wastewater Treatment Facility Improvement
Addition
Post-Bid
$210,000 est. value
Dubuque, IA 52003

Pressure Filter No. 1 Repairs
Renovation
Results
Less than $158,400 est. value
Harlan, IA 51537

Hiawatha Boyson Road WTP Backwash Tank 2021
New Construction
Bidding
Hiawatha, IA 52233

Water Treatment Plant Improvements
New Construction
Results
Shelby, IA

J Avenue Water Treatment Plant Ammonia Storage System Improvements
New Construction
Results
$790,000 est. value
Cedar Rapids, IA 52402

2021 AMU Water Filter Rehabilitation
Renovation
Results
Less than $684,000 est. value
Atlantic, IA

Wastewater Treatment Facility Improvements
Renovation
Post-Bid
$210,000 est. value
Dubuque, IA 52003

Water Treatment Plant Aerator Support Structure Repair
Renovation
Post-Bid
$30,000 est. value
Webster City, IA 50595

Storage of Lime Sludge
Term Contract
Post-Bid
Cedar Rapids, IA

Nevada Wastewater Treatment Facility - Phase 3
New Construction, Renovation
Results
Less than $6,180,000 est. value
Nevada, IA

Water Treatment Improvements
Renovation
Results
$1,043,998 est. value
Dunkerton, IA

City of Center Point WWTP
New Construction
Results
$7,600,000 est. value
Center Point, IA

NW Water Treatment Plant - Softening Basin Addition
Addition
Results
$15,790,000 est. value
Cedar Rapids, IA

NW WTP Generator Building Rehabilitation
Renovation
Results
Cedar Rapids, IA 52405

Last Updated 12/13/2021 09:09 AM
Project Title

12 Mile Water Treatment Plant Repairs

Physical Address View project details and contacts
City, State (County) Creston, IA   (Union County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes all materials, labor, and equipment necessary for earthwork, excavation, backfill and sitework; site piping, cast-in-place reinforced concrete, specialized masonry cleaning and repair of an existing building, PVC roofing system and accessories, joint sealing, doors and frames, painting, surface restoration, testing, and miscellaneous associated work, including clean-up. The project also includes construction of plumbing system including a wastewater holding tank, process piping removal and replacement, HVAC, control equipment, and control programming. Extensive electrical upgrades including electrical sitework, panelboards, motor control centers, variable frequency drives, lighting, and motor replacements are required. Chemical feed equipment including storage tanks, pumps, piping, and controls are included with the project

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents