Similar Projects
O'Reilly Auto Parts (SH3)
New Construction - 6,800 SF
Conception
$500,000 to $900,000 est. value
Sherman, TX

Hanover Southgate Mixed Use
New Construction
Conception
Grand Prairie, TX

Heritage Ranch
New Construction
Design
$100,000,000 est. value
Sherman, TX 75092

Walmart Supercenter #3298-276 - D8 Pet Cooler
Renovation - 204,167 SF
Design
Kemah, TX

FM2 Airline Shops
New Construction - 8,088 SF
Post-Bid
$850,000 est. value
Houston, TX 77003

Commons at Harvest Green Phase II
New Construction - 15,722 SF
Post-Bid
$1,600,000 est. value
Richmond, TX 77406

Rag & Bone
Renovation - 1,879 SF
Construction
$260,000 est. value
Houston, TX 77056

America's Best Contacts & Eyeglasses
Renovation - 3,499 SF
Construction
$255,000 est. value
Denton, TX 76205

Family Dollar Tree
New Construction - 10,500 SF
Pending Verification
$850,000 est. value
Tahoka, TX 79373

Walmart Supercenter #744-278 - OGP-CE
Renovation - 210,672 SF
Design
Humble, TX 77346

Walmart Supercenter #217-605 - CAPXREF-2
Renovation
Post-Bid
Lewisville, TX

Walmart Supercenter #4299-243 - D9 Gun Removal
Renovation - 217,211 SF
Construction
$8,295 est. value
Lubbock, TX 79424

Petsmart
New Construction - 18,000 SF
Design
$1,080,000 est. value
Donna, TX 78537

CVS #7821
Renovation
Post-Bid
League City, TX 77573

Visionworks #1410
Build-Out - 2,900 SF
Construction
Lewisville, TX 75056

Reported 06/29/2022 11:56 AM
Project Title

42nd Street Retail Plaza

Physical Address View project details and contacts
City, State (County) Odessa, TX 79762   (Ector County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method Bids by Invitation.
Project Status Construction Documents, Construction Start Expected July 2022, Construction Completion Expected October 2022
Bids Due View project details and contacts
Estimated Value Less than $989,539
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of an office development in Odessa, Texas. Working plans call for the construction of a 13,760-square-foot office development. As of June 28, 2022, the project has been registered with the Texas Department of Licensing and Regulation. It is unknown if any building permits have been submitted into the City of Odessa. Information regarding the architect and general contractor has not been disclosed. Construction is anticipated to begin July 2022 and completed by October 2022. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Retail, Approximately 13,760 SF New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents