Similar Projects
Murphy USA #7206/7851 / Glasgow
Demolition, New Construction, Infrastructure - 208 SF
Conception
$1,500,000 CJ est. value
Glasgow, KY 42141

Reduce Congestion and Increase Mobility on KY 1297
Infrastructure
Conception
$10,660,000 CJ est. value
Glasgow, KY 42141

Caliber Collison - Abercrombie and Associstion
New Construction, Infrastructure - 14,704 SF
Design
$4,000,000 CJ est. value
Walton, KY 41094

Langley Bullock Industrial Development / Hebron
New Construction, Infrastructure - 230,000 SF
Design
$123,510,000 CJ est. value
Hebron, KY 41048

Bridge Superstructure Replacement - CR 1104
Demolition, New Construction, Infrastructure
Bidding
$385,000 CJ est. value
Jackson, KY 41339

Asphalt Resurfacing - Various Routes in Caldwell County
Infrastructure
Bidding
$790,046 CJ est. value
Princeton, KY 42445

Burger King #29711 / Grayson
New Construction, Infrastructure - 3,352 SF
Post-Bid
$1,000,000 CJ est. value
Grayson, KY 41143

T-Hangar Site Grading
Infrastructure
Post-Bid
Glasgow, KY

Baseball Field Backstop Safety System
Results
Union, KY 41091

Calloway County Public Library
Renovation, Addition
Results
Murray, KY 42071

Florence Apartments
New Construction, Infrastructure
Construction
$25,000,000 CJ est. value
Florence, KY 41042

Sidewalks and Curbs at the William L. Wheeler Hall of Justice
Infrastructure
Construction
$55,005 CJ est. value
Carrollton, KY 41008

Light Industrial Building
New Construction
Pending Verification
Walton, KY 41094

Renaissance on Broadway
New Construction, Infrastructure - 20,000 SF
Pending Verification
$20,000,000 CJ est. value
Louisville, KY 40211

Summit Polymers Manufacturing Facility
New Construction
Conception
$37,500,000 est. value
Lawrenceburg, KY 40342

Last Updated 01/12/2023 12:19 PM
Project Title

Sazerac Manufacturing Facility at Rowland Acres Industrial Park

Physical Address View project details and contacts
City, State (County) London, KY 40741   (Laurel County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $600,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 2023, this project is in planning. The developer has received preliminary approval for a 15-year incentive from the Kentucky Economic Development Finance Authority. Information regarding an architect and general contractor has not been disclosed. A firm timeline has not been confirmed. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

72,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents