Similar Projects
South Aspen Avenue Mixed Use Project Development
New Construction, Infrastructure - 260,000 SF
Conception
$132,000,000 CJ est. value
Broken Arrow, OK 74011

Proposition 4 - Tulsa Public Schools
Renovation
Conception
$90,695,000 CJ est. value
Tulsa, OK 74103

Pavement Rehabilitation
Infrastructure
Design
$22,434,951 CJ est. value
Tulsa, OK 74110

I-44 - Utilities
Infrastructure
Design
$2,013,883 CJ est. value
Tulsa, OK 74145

RFQ Construction Manager at Risk - Case Center Tennis Center at LaFortune Park
New Construction, Infrastructure
Bidding
$700,000 CJ est. value
Tulsa, OK 74135

Grade, Drain, Surface, and Bridge City Street (23rd Street)
Infrastructure
Bidding
$14,716,694 CJ est. value
Broken Arrow, OK 74011

Interior Construction Remodel
Renovation
Post-Bid
Sand Springs, OK

Upper Elementary and Early Childhood Center Additions
Addition
Post-Bid
Collinsville, OK 74021

Sidewalk and Curb Ramp Construction for CBDG / HUD Grant
Infrastructure
Results
$235,173 CJ est. value
Tulsa, OK 74103

New Greenhouse/Hoop House - Union Public Schools
New Construction
Results
$207,446 est. value
Tulsa, OK 74146

The Learning Experience
New Construction
Construction
Broken Arrow, OK 74012

Jenks Speech Therapy
New Construction, Infrastructure - 6,080 SF
Construction
$1,300,000 CJ est. value
Jenks, OK 74037

South Elementary School
New Construction, Addition
Pending Verification
Tulsa, OK 74107

North Elementary School
Renovation
Pending Verification
Bixby, OK 74008

LaFortune Park Splash Pad - Tulsa County
Infrastructure
Conception
$550,000 CJ est. value
Tulsa, OK 74135

Last Updated 12/28/2022 08:35 AM
Project Title

Tulsa Classical Academy

Physical Address View project details and contacts
City, State (County) Tulsa, OK 74133   (Tulsa County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $8,006,231 [brand] Estimate
Plans Available from Geotechnical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 28, 2022, construction is underway and they are still working through contracts. *The original solicitation is listed below for historical reference. We have received a 100% complete bid set. The new bid due date is 8/16/2022 by 5:00 pm. Please review the following dates: The project start date is tentatively in August 2022 with a 12-month duration. Aug 9 - Last day for bidders to submit questions Aug 11/12 - Babcock Design to issue addendum Aug 16 - Bids due Project Description: This school is approximatively 50,279 sq. ft. The drawings are in design development and only about 50% complete, so any assumptions you make are to be noted on your proposal. Any VE options are encouraged. Please note them as well. Project start date is tentatively in August 2022 with a 12 month duration. Please email any questions to Scott Nielsen at scottn@stoutllc.com. We look forward to hearing from you.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents