Similar Projects
Art Center Fire Suppression Installation
Alteration
Bidding
Glenwood Springs, CO 81601

Down Tube Low Pressure Test for Halon Fire Extinguishers
Term Contract
Bidding
Aurora, CO

Firestone Auto Care - Firestone
Post-Bid
Firestone, CO

Mcglone Es Fire Suppression System
Post-Bid
Denver, CO 80239

SCF Fire Alarm Replacement Phases 1 & 2
Results
$1,350,000 est. value
Sterling, CO

Electrical Contractors/Upgrade Fire Alarm Mass Notification
Results
Golden, CO 80401

Wheat Ridge - Updated Fire Detection & Monitoring Systems
Post-Bid
$1,400,000 est. value
Wheat Ridge, CO 80033

Denver, CO - Fire and Life Safety Services
Results
Denver, Westminster, CO

Randolph Fire Alarm & Detection System Replacement
Post-Bid
Denver, CO 80205

Fire Alarm Testing, Service and Repair
Term Contract
Results
Brighton, CO 80601

Noel Campus Fire Alarm & Detection System Replacement
Post-Bid
Denver, CO 80239

Z1DA--554 Replace Spray Fireproofing Buildings K and H (VA-19-00078184)
Results
Less than $25,000 est. value
Denver, CO

Fire Alarm Replacement Projects
Post-Bid
Fort Collins, CO 80524

Fire Detection and Suppression Equipment Maintenance and Inspection Services
Term Contract
Results
Thornton, CO 80241

Fire Alarm Upgrades
Post-Bid
CO

Last Updated 06/10/2021 01:37 PM
Project Title

Design and Installation of Fire Sprinkler System

Physical Address View project details and contacts
City, State (County) Pueblo, CO   (Pueblo County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $230,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes designing and installing a new “turnkey” wet-pipe fire suppression system throughout the interior of the Palace of Agriculture Building. The 74,000 square foot building is comprised of basement space, first floor arena space (high ceiling – approximately 40’ above finished floor), open corridor surrounding arena, office space and a second-floor community and office space. The contractor will be responsible for complete design and construction installation of this system per the contract and applicable code requirements. The base scope of work is to provide fire suppression for the first and second floors. An add-alternate is included to provide fire suppression in the basement and underground tunnels of the building.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents