Similar Projects
12.94 MI of Single Chip and Fog Seal, Hot Mix Asphalt Shoulder Widening with Milled Corrugations and Pavement Markings on Kilgore Road From Lapeer Road North to Metcalf Road and From South of Mericle Road to South of Beard Road And Yale Road from the Yale City Limits to East of Duce Road
Infrastructure
Bidding
MI

Up to 196.32 Lnmi of Hot Mix Asphalt Crack Treatment
Infrastructure
Bidding

Central Division - Asphalt Paving Maintenance
Post-Bid

2021 Asphalt Paving Project - Smiths Creek Landfill
Post-Bid
Smiths Creek, MI 48074

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

6.55 MI of Hot Mix Asphalt Reconstruction and Concrete Pavement Reconstruction, Fiber Relocation, Culverts, Guardrail, Signing and Pavement Markings
Results
MI

Paving & Site Lighting
Post-Bid

Southern St. Clair County Paving 2021
Results
Less than $1,020,000 est. value
Saint Clair, MI

Fire and Water Department Paving Project
Post-Bid
Fair Haven, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Street Improvements
Post-Bid
Yale, MI

2021 Northern St. Clair County Paving Projects
Results
Less than $796,144 est. value
Saint Clair, MI

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

1.23 MI of Hot Mix Asphalt Cold Milling and Resurfacing, Aggregate Shoulders, Resurfacing Parking Lot and Pavement Markings
Results
MI

2021 St. Clair County Cape Seal Program
Results
Less than $115,000 est. value
Port Huron, MI

Last Updated 02/25/2022 12:03 AM
Project Title

Fort Street Reconstruction

Physical Address View project details and contacts
City, State (County) Port Huron, MI   (Saint Clair County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, material and equipment to reconstruct Fort Street from Quay Street to Beers Street and remove Bard Street from Fort Street to Merchant Street for a complete installation per project plans and specifications. The work includes pavement removal, sidewalk removal, sanitary sewer, storm sewer, water main, grading, aggregate base, curb and gutter, HMA paving, ADA sidewalk ramps, sidewalk replacement, pavement markings, signs, and restoration. Major items: 15,000 SYD Pavement Removal 13,000 SYD HMA Paving, Base, Leveling and Wearing Courses 5,000 FT Concrete Curb and Gutter 24,000 SFT Sidewalk and Ramps 770 FT Storm Sewer, Various Sizes 2,300 FT Sanitary Sewer, 10” & 30” 2,200 FT Water Main, 6”-12”

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents