Similar Projects
Sheahan Filter Valve Replacement
Renovation
Bidding
Memphis, TN 38111

Old Hillsboro Road Water Pumping Station
Infrastructure
Bidding
$6,200,000 est. value
Franklin, TN 37065

Sewer System Improvements Express Mart Pump Station Replacement
Post-Bid
TN 37847

Contract 121- Hayshed Road and Luke Lane Sewer Improvements
Post-Bid
Charlotte, TN 37036

Sewer System Improvements - Sewage Pumping Station Replacement at WWTP
Results
Pulaski, TN

2018-19 Lift Station Phase-Out
Renovation
Results
Johnson City, TN

Fort Hudson Pump Station Improvements
Renovation
Bidding
$600,000 est. value
Dyersburg, TN

Influent Screening Improvements
New Construction
Post-Bid
Mount Pleasant, TN

2020 ARC Project for Clayton Homes Pump Station and Force Main Conveyance
New Construction
Results
Rutledge, TN

Boones Creek 1937 Booster Station
New Construction
Bidding
Johnson City, TN

Sewer Pump Station Wetwell Cleaning
New Construction
Post-Bid
Murfreesboro, TN

Gardens Lift Station Upgrade
Renovation
Results
Crossville, TN

Pump Station No. 30
New Construction
Post-Bid
$200,000 est. value
Clinton, TN

WWTP Water Pump Station Enclosure
Results
Clarksville, TN

Sewer Pump Station Rehabilitation
Renovation, Infrastructure
Post-Bid
Kingston Springs, TN

Reported 02/17/2022 05:15 PM
Project Title

Lift Station Rehabilitation Group 2

Physical Address View project details and contacts
City, State (County) Memphis, Millington, TN 38108   (Shelby County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Project Delayed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for this project includes rehabilitation of eleven (11) lift stations at various locations. Each lift station has varying amounts and types of rehabilitation needed. The work includes, but is not limited to, electrical equipment replacement, pump motor replacement, bypass tee installation, complete lift station relocation or replacement, new force main installation, wet well & drywell coating, erosion control, traffic control, and site prep & restoration

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents